   The Subdivision Map Act authorizes a local agency to require the
payment of a fee as a condition of approval of a final map or as a
condition of issuing a building permit for purposes of defraying the
actual or estimated cost of constructing bridges or major
thoroughfares if specified conditions are met.
   This bill would authorize the fee to additionally be used for
defraying the actual or estimated cost of other transportation
facilities, as described.
   Vote: majority. Appropriation: no. Fiscal committee: no.
State-mandated local program: no.


THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

  SECTION 1.  Section 66484 of the Government Code is amended to
read:
   66484.  (a) A local ordinance may require the payment of a fee as
a condition of approval of a final map or as a condition of issuing a
building permit for purposes of defraying the actual or estimated
cost of constructing bridges over waterways, railways, freeways, and
canyons,  or  constructing major thoroughfares ,
or constructing other transportation facilities, including, but not
limited to, pedestrian, bicycle, transit, and traffic-calming
facilities  . The ordinance may require payment of fees pursuant
to this section if all of the following requirements are satisfied:
   (1) The ordinance refers to the circulation element of the general
plan and,  in the case of bridges, to the transportation or
flood control provisions thereof that identify railways, freeways,
streams, or canyons for which bridge crossings are required on the
general plan or local roads and in the case of major thoroughfares,
to the provisions of the circulation element that identify those
major thoroughfares whose primary purpose is to carry through traffic
and provide a network connecting to the state highway system,
 if the circulation element, transportation  ,  or
flood control provisions have been adopted by the local agency 30
days prior to the filing of a map or application for a building
permit  .   :  
   (A) In the case of bridges, to the transportation or flood control
provisions thereof that identify railroads, freeways, streams, or
canyons for which bridge crossings are required on the general plan
or local roads.  
   (B) In the case of major thoroughfares, to the provisions of the
circulation element that identify those major thoroughfares whose
primary purpose is to carry through traffic and provide a network
connecting to the state highway system.  
   (C) In the case of other transportation facilities, to the
provisions of the circulation element that identify those
transportation facilities that are required to minimize the use of
automobiles and minimize the traffic impacts of new development on
existing roads. 
   (2) The ordinance provides that there will be a public hearing
held by the governing body for each area benefited. Notice shall be
given pursuant to Section 65091 and shall include preliminary
information related to the boundaries of the area of benefit,
estimated cost, and the method of fee apportionment. The area of
benefit may include land or improvements in addition to the land or
improvements that are the subject of any map or building permit
application considered at the proceedings.
   (3) The ordinance provides that at the public hearing the
boundaries of the area of benefit, the costs, whether actual or
estimated, and a fair method of allocation of costs to the area of
benefit and fee apportionment are established. The method of fee
apportionment, in the case of major thoroughfares, shall not provide
for higher fees on land that abuts the proposed improvement except
where the abutting property is provided direct usable access to the
major thoroughfare. A description of the boundaries of the area of
benefit, the costs, whether actual or estimated, and the method of
fee apportionment established at the hearing shall be incorporated in
a resolution of the governing body, a certified copy of which shall
be recorded by the governing body conducting the hearing with the
recorder of the county in which the area of benefit is located. The
apportioned fees shall be applicable to all property within the area
of benefit and shall be payable as a condition of approval of a final
map or as a condition of issuing a building permit for the property
or portions of the property. Where the area of benefit includes lands
not subject to the payment of fees pursuant to this section, the
governing agency shall make provision for payment of the share of
improvement costs apportioned to those lands from other sources.
   (4) The ordinance provides that payment of fees shall not be
required unless the major thoroughfares are in addition to, or a
reconstruction of, any existing major thoroughfares serving the area
at the time of the adoption of the boundaries of the area of benefit.

   (5) The ordinance provides that payment of fees shall not be
required unless the planned bridge facility is an original bridge
serving the area or an addition to any existing bridge facility
serving the area at the time of the adoption of the boundaries of the
area of benefit. The fees shall not be expended to reimburse the
cost of existing bridge facility construction.
   (6) The ordinance provides that if, within the time when protests
may be filed under the provisions of the ordinance, there is a
written protest, filed with the clerk of the legislative body, by the
owners of more than one-half of the area of the property to be
benefited by the improvement, and sufficient protests are not
withdrawn so as to reduce the area represented to less than one-half
of that to be benefited, then the proposed proceedings shall be
abandoned, and the legislative body shall not, for one year from the
filing of that written protest, commence or carry on any proceedings
for the same improvement or acquisition under the provisions of this
section.
   (b) Any protest may be withdrawn by the owner protesting, in
writing, at any time prior to the conclusion of a public hearing held
pursuant to the ordinance.
   (c) If any majority protest is directed against only a portion of
the improvement, then all further proceedings under the provisions of
this section to construct that portion of the improvement so
protested against shall be barred for a period of one year, but the
legislative body may commence new proceedings not including any part
of the improvement or acquisition so protested against. Nothing in
this section prohibits a legislative body, within that one-year
period, from commencing and carrying on new proceedings for the
construction of a portion of the improvement so protested against if
it finds, by the affirmative vote of four-fifths of its members, that
the owners of more than one-half of the area of the property to be
benefited are in favor of going forward with that portion of the
improvement or acquisition.
   (d) Nothing in this section precludes the processing and
recordation of maps in accordance with other provisions of this
division if the proceedings are abandoned.
   (e) Fees paid pursuant to an ordinance adopted pursuant to this
section shall be deposited in a planned bridge facility  or
  ,  major thoroughfare  , or transportation
facility  fund. A fund shall be established for each planned
bridge facility project  or   ,  each
planned major thoroughfare project , or each planned
transportation facility project  . If the benefit area is one in
which more than one bridge  or   ,  major
thoroughfare  , or other transportation facili   ty
 is required to be constructed, a fund may be so established
covering all of the bridge  and   ,  major
thoroughfare  , and other   transportation facility
 projects in the benefit area. Money in the fund shall be
expended solely for the construction or reimbursement for
construction of the improvement or improvements serving the area to
be benefited and from which the fees comprising the fund were
collected, or to reimburse the local agency for the cost of
constructing the improvement or improvements.
   (f) An ordinance adopted pursuant to this section may provide for
the acceptance of considerations in lieu of the payment of fees.
   (g) A local agency imposing fees pursuant to this section may
advance money from its general fund or road fund to pay the cost of
constructing the improvements and may reimburse the general fund or
road fund for any advances from planned bridge facility  or
  ,  major thoroughfares  , or other
transportation facility  funds established to finance the
construction of those improvements.
   (h) A local agency imposing fees pursuant to this section may
incur an interest-bearing indebtedness for the construction of bridge
facilities  or   ,  major thoroughfares
 , or other transportation facilities  . However, the sole
security for repayment of that indebtedness shall be moneys in
planned bridge facility  or   ,  major
thoroughfares  , or transportation facility  funds.
   (i) (1) The term "construction," as used in this section, includes
design, acquisition of rights-of-way, administration of construction
contracts, and actual construction.
   (2) The term "construction," as used in this section, with respect
to the unincorporated areas of San Diego County and Los Angeles
County only, includes design, acquisition of rights-of-way, and
actual construction, including, but not limited to, all direct and
indirect environmental, engineering, accounting, legal,
administration of construction contracts, and other services
necessary therefor. The term "construction," with respect to the
unincorporated areas of San Diego County and Los Angeles County only,
also includes reasonable administrative expenses, not exceeding
three hundred thousand dollars ($300,000) in any calendar year after
January 1, 1986, as adjusted annually for any increase or decrease in
the Consumer Price Index of the Bureau of Labor Statistics of the
United States Department of Labor for all Urban Consumers, San Diego,
California (1967 = 100), and Los Angeles-Long Beach-Anaheim,
California (1967 = 100), respectively, as published by the United
States Department of Commerce for the purpose of constructing bridges
 and   ,  major thoroughfares  , and
other transportation facilities  . "Administrative expenses"
means those office, personnel, and other customary and normal
expenses associated with the direct management and administration of
the agency, but not including costs of construction.
   (3) The term "construction," as used in this section, with respect
to Los Angeles County only, shall have the same meaning as in
paragraph (2) in either of the following circumstances:
   (A) The area of benefit includes, and all of the bridge 
and   ,  major thoroughfare  , and other
transportation facility  project improvements lie within, both a
city or a portion of a city and adjacent portions of unincorporated
area.
   (B) All of the area of benefit and all of the bridge  and
  ,  major thoroughfare  , and other
transportation facility  project improvements lie completely
within the boundaries of a city.
   (j) Nothing in this section precludes a county or city from
providing funds for the construction of bridge facilities  or
  ,  major thoroughfares  , or other
transportation facilities  to defray costs not allocated to the