Existing law requires funds in the State Highway Account to be programmed, budgeted, and expended to maximize the use of federal funds and according to a specified sequence of priorities. Existing law requires the Department of Transportation to provide certain information to the Legislature to substantiate the department’s proposed capital outlay support budget.

This bill would make nonsubstantive changes to these provisions.

Vote: majority. Appropriation: no. Fiscal committee: no. State-mandated local program: no.

The people of the State of California do enact as follows:

P1    1

SECTION 1.  

Section 167 of the Streets and Highways Code
2 is amended to read:

3

167.  

(a) Funds in the State Highway Account in the State
4Transportation Fund shall be programmed, budgeted subject to
5Section 163, and expended to maximize the use of federal funds
6and shall be based on the following sequence of priorities:

7(1) Operation, maintenance, and rehabilitation of the state
8highway system.

P2    1(2) Safety improvements where physical changes, other than
2adding additional lanes, would reduce fatalities and the number
3and severity of injuries.

4(3) Transportation capital improvements that expand capacity
5or reduce congestion, or do both.

6(4) Environmental enhancement and mitigation programs.

7(b) With respect to the funds in the State Highway Account, in
8the Public Transportation Account, and in the Passenger Rail Bond
9Fund, the proposed budget shall be organized on a program basis.
10The proposed budget shall list the proposed expenditures for the
11transportation program under the following program elements:

12(1) Administration.

13(2) Program development.

14(3) Maintenance.

15(4) State highway operation and protection.

16(5) Local assistance.

17(6) Interregional improvements.

18(7) Regional improvements.

19(8) Environmental enhancement and mitigation programs.

20(c) State operations expenditure amounts of the department for
21interregional and regional transportation improvement projects
22shall be listed as required by subdivision (b) of Section 14529 of
23the Government Code, but those amounts other than those for the
24acquisition of rights-of-way, construction, and construction support
25shall not be subject to allocation by the commission.

26(d) To align the annual budget with the adopted state
27transportation improvement program, the department may submit
28to the Department of Finance revised capital outlay support and
29capital outlay budget estimates as part of its May Revision process.
30Budget proposals related to these changes shall be provided to the
31Legislature no later than May 1.

32(e) The budget shall not include specific appropriations for
33specific transportation improvement projects, and the Legislature
34shall not enact legislation containing specific individual
35transportation projects.

36(f) The basis for defining major and minor capital outlay projects
37shall be established by the commission.

38(g) The Legislative Analyst shall prepare an analysis of the
39proposed expenditures for each program element as a part of the
40budget analysis.

P3    1(h) The department shall submit to the Legislative Analyst,begin delete andend delete
2 the Senate Committee on Budget and Fiscal Reviewbegin insert,end insert and the
3Assembly Committee on Budget, on an annual basis, supplemental
4information to substantiate the department’s proposed capital outlay
5support budget. The information shall be provided no later than
6May 1 of each year, and may be provided at an earlier date. The
7information shall include, but not be limited to, the following:

8(1) A list of projects for which the department will perform
9capital outlay support work in the budget year. For each project,
10the department shall include:

11(A) The planned project support budget for support of
12environmental, design, right-of-way, and construction phases.

13(B) The planned capital costs, including construction capital
14costs and right-of-way capital costs.

15(C) The estimated or actual construction start date and
16 completion date.

17(D) The name and year of the state transportation program in
18which the project is programmed, if applicable.

19(E) Total prior fiscal year expenditures for capital outlay support.

20(F) The number of full-time equivalent positions requested to
21perform support of environmental, design, right-of-way, and
22construction work in the fiscal year of the budget request.

23(G) Milestones of project work by phases that are planned to
24be completed in the fiscal year of the budget request.

25(H) The ratio of support to capital costs based on current
26programming.

27(2) The capital-to-support ratio for all projects completed in the
28 prior fiscal year in each program in each district.

29(3) The current total number of authorized and vacant positions
30in the capital outlay support program in headquarters and in each
31district.

32(4) A five-year projection of the department’s staffing needs to
33support the state’s transportation capital programs and any
34workload performed by the department related to federal or local
35funding for highway capital projects.

36(5) The average cost of a personnel-year equivalent in each
37district based on the department’s existing contracts for capital
38outlay support work performed by a private company under
39contract with the department. For each average cost, the department
40shall provide a description of what factors are included in that cost.

P4    1(6) The average cost of a state staff personnel-year in the capital
2outlay support program in each district and in headquarters. The
3cost shall include the salary and wages, benefits, program overhead,
4administrative overhead, and other associated costs. The
5department shall provide a description of each component of the
6average cost.

7(7) A summary of expected capital outlay support workload for
8the budget year that includes the following:

9(A) The total full-time equivalents requested for each type of
10the following activities: environmental, design, right-of-way, and
11construction.

12(B) The total full-time equivalents requested for each type of
13project, including, but not limited to, the state transportation
14improvement program, the state highway operation and protection
15program, bond programs, regional and local agency partnership
16 workload, and any other program.

17(8) The total number of projects with requested resources, as
18well as the number of projects in which the department is limited
19to an oversight role.

20(9) The number of milestones scheduled, including
21environmental, design, right-of-way, and construction deliverables,
22as well as the number of projects expected to begin construction
23and reach completion.

24(10) A summary for the most recently completed fiscal year for
25the following:

26(A) Full-time equivalents and related funding expended,
27including support of environmental, design, right-of-way, and
28construction activities.

29(B) Approved and filled positions as of the end of the fiscal
30 year.



O

    99