Existing law requires certain transportation funds made available for transportation capital improvement projects to be programmed and expended in specified amounts for interregional improvements and regional improvements. Existing law specifies the state highway routes that are included in the interregional road system and the state highway routes that are eligible interregional and intercounty routes.
end insertbegin insertThis bill would include State Highway Route 43 as an eligible interregional and intercounty route.
end insertExisting law requires funds in the State Highway Account to be programmed, budgeted, and expended to maximize the use of federal funds and according to a specified sequence of priorities. Existing law requires the Department of Transportation to provide certain information to the Legislature to substantiate the department’s proposed capital outlay support budget.
end deleteThis bill would make nonsubstantive changes to these provisions.
end deleteVote: majority.
Appropriation: no.
Fiscal committee: begin deleteno end deletebegin insertyesend insert.
State-mandated local program: no.
The people of the State of California do enact as follows:
begin insertSection 164.12 of the end insertbegin insertStreets and Highways Codeend insert
2begin insert is amended to read:end insert
For purposes ofbegin delete subdivision (e) ofend delete Section 164.3, the
4eligible interregional and intercounty routes include all of the
5following:
6Route 36, between Route 5 and Route 395.
7Route 37, between the east urban limits of San
8Francisco-Oakland near Novato and the west urban limits of San
9Francisco-Oakland near Vallejo.
10Route 38, between the east urban limits of San
11Bernardino-Riverside and Route 18 west of Big Bear Lake.
12Route 40.
13Route 41, between Route 1 and Yosemite National Park.
begin insert14Route 43.
end insert
15Route 44, between the east urban limits of Redding and Route
1636.
17Route 46, between Route 1 and Route 99.
18Route 49, between Route 41 and Route 89.
Section 167 of the Streets and Highways Code
20 is amended to read:
(a) Funds in the State Highway Account in the State
22Transportation Fund shall be programmed, budgeted subject to
23Section 163, and expended to maximize the use of federal funds
24and shall be based on the following sequence of priorities:
25(1) Operation, maintenance, and rehabilitation of the state
26highway system.
27(2) Safety improvements where physical changes, other than
28adding additional lanes, would reduce fatalities and the number
29and severity of injuries.
30(3) Transportation capital improvements that expand capacity
31or reduce congestion, or do both.
32(4) Environmental enhancement and mitigation programs.
33(b) With respect to the funds in the State Highway Account, in
34the Public Transportation Account, and in the Passenger Rail Bond
35Fund, the proposed budget shall be organized on a program basis.
36The proposed budget shall list the proposed expenditures for the
37transportation program under the following program elements:
38(1) Administration.
P3 1(2) Program development.
2(3) Maintenance.
3(4) State highway operation and protection.
4(5) Local assistance.
5(6) Interregional improvements.
6(7) Regional improvements.
7(8) Environmental enhancement and mitigation programs.
8(c) State operations expenditure amounts of the department for
9interregional and regional transportation improvement projects
10shall be listed as required by subdivision (b) of Section 14529 of
11the Government Code, but those amounts other than those for the
12acquisition of rights-of-way, construction, and construction support
13shall not be subject to allocation by the commission.
14(d) To align the annual budget with the adopted state
15transportation improvement program, the department may submit
16to the Department of Finance revised capital outlay support and
17capital outlay budget estimates as part of its May Revision process.
18Budget proposals related to these changes shall be provided to the
19Legislature no later than May 1.
20(e) The budget shall not include specific appropriations for
21specific transportation improvement projects, and the Legislature
22shall not enact legislation containing specific individual
23transportation projects.
24(f) The basis for defining major and minor capital outlay projects
25shall be established by the commission.
26(g) The Legislative Analyst shall prepare an analysis of the
27proposed expenditures for each program element as a part of the
28budget analysis.
29(h) The department shall submit to the Legislative Analyst, the
30Senate Committee on Budget and Fiscal Review,
and the Assembly
31Committee on Budget, on an annual basis, supplemental
32information to substantiate the department’s proposed capital outlay
33support budget. The information shall be provided no later than
34May 1 of each year, and may be provided at an earlier date. The
35information shall include, but not be limited to, the following:
36(1) A list of projects for which the department will perform
37capital outlay support work in the budget year. For each project,
38the department shall include:
39(A) The planned project support budget for support of
40environmental, design, right-of-way, and construction phases.
P4 1(B) The planned capital costs, including construction capital
2costs and right-of-way capital costs.
3(C) The estimated or actual construction start date and
4
completion date.
5(D) The name and year of the state transportation program in
6which the project is programmed, if applicable.
7(E) Total prior fiscal year expenditures for capital outlay support.
8(F) The number of full-time equivalent positions requested to
9perform support of environmental, design, right-of-way, and
10construction work in the fiscal year of the budget request.
11(G) Milestones of project work by phases that are planned to
12be completed in the fiscal year of the budget request.
13(H) The ratio of support to capital costs based on current
14programming.
15(2) The capital-to-support ratio for all projects completed in the
16
prior fiscal year in each program in each district.
17(3) The current total number of authorized and vacant positions
18in the capital outlay support program in headquarters and in each
19district.
20(4) A five-year projection of the department’s staffing needs to
21support the state’s transportation capital programs and any
22workload performed by the department related to federal or local
23funding for highway capital projects.
24(5) The average cost of a personnel-year equivalent in each
25district based on the department’s existing contracts for capital
26outlay support work performed by a private company under
27contract with the department. For each average cost, the department
28shall provide a description of what factors are included in that cost.
29(6) The average cost
of a state staff personnel-year in the capital
30outlay support program in each district and in headquarters. The
31cost shall include the salary and wages, benefits, program overhead,
32administrative overhead, and other associated costs. The
33department shall provide a description of each component of the
34average cost.
35(7) A summary of expected capital outlay support workload for
36the budget year that includes the following:
37(A) The total full-time equivalents requested for each type of
38the following activities: environmental, design, right-of-way, and
39construction.
P5 1(B) The total full-time equivalents requested for each type of
2project, including, but not limited to, the state transportation
3improvement program, the state highway operation and protection
4program, bond programs, regional and local agency partnership
5
workload, and any other program.
6(8) The total number of projects with requested resources, as
7well as the number of projects in which the department is limited
8to an oversight role.
9(9) The number of milestones scheduled, including
10environmental, design, right-of-way, and construction deliverables,
11as well as the number of projects expected to begin construction
12and reach completion.
13(10) A summary for the most recently completed fiscal year for
14the following:
15(A) Full-time equivalents and related funding expended,
16including support of environmental, design, right-of-way, and
17construction activities.
18(B) Approved and filled positions as of the end of the fiscal
19
year.
O