BILL NUMBER: AB 2363	AMENDED
	BILL TEXT

	AMENDED IN ASSEMBLY  APRIL 10, 2014

INTRODUCED BY   Assembly Member  Quirk   Dahle

    (   Principal coauthor:   Assembly Member
  Alejo   ) 
    (   Coauthors:   Assembly Members 
 Bradford,   Jones,   and Patterson  
) 

                        FEBRUARY 21, 2014

    An act to add Section 38575 to the Health and Safety
Code, relating to greenhouse gases.   An act to amend
Sectio   ns 399.13, 399.15, and 454.5 of the Public
Utilities Code, relating to energy. 



	LEGISLATIVE COUNSEL'S DIGEST


   AB 2363, as amended,  Quirk   Dahle  .
 Greenhouse gases: offsets.   Electricity
procurement.  
   (1) Under existing law, the Public Utilities Commission has
regulatory authority over public utilities, including electrical
corporations, as defined, while local publicly owned electric
utilities, as defined, are under the direction of their governing
board. The Public Utilities Act imposes various duties and
responsibilities on the Public Utilities Commission with respect to
the purchase of electricity and requires the commission to review and
adopt a procurement plan and a renewable energy procurement plan for
each electrical corporation pursuant to the California Renewables
Portfolio Standard Program.  
   The Public Utilities Act requires the Public Utilities Commission
to review and adopt an overall procurement plan for each electrical
corporation to meet electricity demand for its customers in
accordance with specified elements, incentive mechanisms, and
objectives. The act requires the Public Utilities Commission to
review and accept, modify, or reject each electrical corporation's
procurement plan and requires that each approved procurement plan
accomplish specified objectives.  
   This bill would require the Public Utilities Commission to direct
electrical corporations to include in their proposed procurement
plans the use of any nonzero integration cost adders, as specified.
 
   (2) The California Renewables Portfolio Standard Program requires
a retail seller, as defined, and local publicly owned electric
utilities to purchase specified minimum quantities of electricity
products from eligible renewable energy resources, as defined, for
specified compliance periods. The program, consistent with the goals
of procuring the least-cost and best-fit eligible renewable energy
resources that meet project viability principles, requires that all
retail sellers procure a balanced portfolio of electricity products
from eligible renewable energy resources, as specified, referred to
as the portfolio content requirements. The program requires the
commission to adopt, by rulemaking, a process that provides criteria
for the rank ordering and selecting of least-cost and best-fit
eligible renewable energy resources to comply with the program
obligations on a total cost basis, taking into account specified
matter. Existing law authorizes the commission to require a retail
seller to procure eligible renewable energy resources in excess of
the specified minimum quantities of electricity products of the
renewables portfolio standard.  
   This bill additionally would require the commission to adopt, by
rulemaking, by October 1, 2015, a nonzero integration cost adder
methodology that reflects a reasonable estimate of the costs of
procuring capacity and energy required to accommodate the electrical
generation of the particular eligible renewable energy resource. The
bill would require the commission to consider the nonzero integration
cost adder methodology prior to approving any procurement of
eligible renewable energy resources by a retail seller that is in
excess of the specified minimum quantities of electricity products
required to be purchased pursuant to the renewables portfolio
standard.  
   The California Global Warming Solutions Act of 2006 designates the
State Air Resources Board as the state agency charged with
monitoring and regulating sources of emissions of greenhouse gases.
The state board is required to adopt a statewide greenhouse gas
emissions limit equivalent to the statewide greenhouse gas emissions
level in 1990 to be achieved by 2020, and to adopt rules and
regulations in an open public process to achieve the maximum,
technologically feasible, and cost-effective greenhouse gas emission
reductions. The act authorizes the state board to include the use of
market-based compliance mechanisms.  
   This bill would require the state board to adopt regulations
providing for the generation of offset credits that may be used,
sold, or traded pursuant to a market-based compliance mechanism that
the state board may adopt for forest management activities performed
for the purpose of reducing the risk of severe wildfires and
activities involving the application of biochar, as defined, to soil.

   Vote: majority. Appropriation: no. Fiscal committee: yes.
State-mandated local program: no.


THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

   SECTION 1.    The Legislature finds and declares all
of the following:  
   (a) California is leading the world in adopting comprehensive
programs that reduce emissions of greenhouse gases, including passage
of the California Global Warming Solutions Act of 2006 (Division
25.5 (commencing with Section 38500) of the Health and Safety Code)
and the California Renewables Portfolio Standard Program (Article 16
(commencing with Section 399.11) of Chapter 2.3 of Part 1 of Division
1 of the Public Utilities Code).  
   (b) The state has an abundant supply of renewable energy
resources, including geothermal, biomass, biomethane, wind, and
solar, that have contributed to the state's ability to reduce its
emissions of greenhouse gases and meet its renewables portfolio
standard procurement targets.  
   (c) It is in the public's interest that the state continue to
promote policies to ensure eligible renewable energy resources be
procured and contributed to the state's ability to reduce its
greenhouse gas emissions and meet the targets of the California
Renewables Portfolio Standard Program (Article 16 (commencing with
Section 399.11) of Chapter 2.3 of Part 1 of Division 1 of the Public
Utilities Code).  
   (d) There are eligible renewable energy resources in the state
that, if developed and retained, would not require additional
capacity to maintain the reliability of the bulk electrical system
and could generate during periods in which electricity is likely to
be the most valuable, prospectively.  
   (e) Procuring and retaining a diversified portfolio of eligible
renewable energy resources may do all of the following:  
   (1) Assist electrical corporations in satisfying renewable energy
procurement and greenhouse gases emissions reductions goals in a
cost-effective manner.  
   (2) Partially meet peak load requirements with electricity
generated by eligible renewable energy resources, which will have
substantial benefits from reduced emissions of greenhouse gases, and
cobenefits from reduced emissions of criteria pollutants.  
   (3) Maintain the reliability of the electrical grid to meet demand
for electricity on a 24-hour basis.  
   (4) Contribute to local employment and economic growth throughout
the state. 
   SEC. 2.    Section 399.13 of the   Public
Utilities Code   is amended to read: 
   399.13.  (a) (1) The commission shall direct each electrical
corporation to annually prepare a renewable energy procurement plan
that includes the matter in paragraph (5), to satisfy its obligations
under the renewables portfolio standard. To the extent feasible,
this procurement plan shall be proposed, reviewed, and adopted by the
commission as part of, and pursuant to, a general procurement plan
process. The commission shall require each electrical corporation to
review and update its renewable energy procurement plan as it
determines to be necessary.
   (2) Every electrical corporation that owns electrical transmission
facilities shall annually prepare, as part of the Federal Energy
Regulatory Commission Order 890 process, and submit to the
commission, a report identifying any electrical transmission
facility, upgrade, or enhancement that is reasonably necessary to
achieve the renewables portfolio standard procurement requirements of
this article. Each report shall look forward at least five years
and, to ensure that adequate investments are made in a timely manner,
shall include a preliminary schedule when an application for a
certificate of public convenience and necessity will be made,
pursuant to Chapter 5 (commencing with Section 1001), for any
electrical transmission facility identified as being reasonably
necessary to achieve the renewable energy resources procurement
requirements of this article. Each electrical corporation that owns
electrical transmission facilities shall ensure that project-specific
interconnection studies are completed in a timely manner.
   (3) The commission shall direct each retail seller to prepare and
submit an annual compliance report that includes all of the
following:
   (A) The current status and progress made during the prior year
toward procurement of eligible renewable energy resources as a
percentage of retail sales, including, if applicable, the status of
any necessary siting and permitting approvals from federal, state,
and local agencies for those eligible renewable energy resources
procured by the retail seller, and the current status of compliance
with the portfolio content requirements of subdivision (c) of Section
399.16, including procurement of eligible renewable energy resources
located outside the state and within the WECC and unbundled
renewable energy credits.
   (B) If the retail seller is an electrical corporation, the current
status and progress made during the prior year toward construction
of, and upgrades to, transmission and distribution facilities and
other electrical system components it owns to interconnect eligible
renewable energy resources and to supply the electricity generated by
those resources to load, including the status of planning, siting,
and permitting transmission facilities by federal, state, and local
agencies.
   (C) Recommendations to remove impediments to making progress
toward achieving the renewable energy resources procurement
requirements established pursuant to this article.
   (4) The commission shall adopt, by rulemaking, all of the
following:
   (A) A process that provides criteria for the rank ordering and
selection of least-cost and best-fit eligible renewable energy
resources to comply with the California Renewables Portfolio Standard
Program obligations on a total cost basis. This process shall take
into account all of the following:
   (i) Estimates of indirect costs associated with needed
transmission investments and ongoing electrical corporation expenses
resulting from integrating and operating eligible renewable energy
resources.
   (ii) The cost impact of procuring the eligible renewable energy
resources on the electrical corporation's electricity portfolio.
   (iii) The viability of the project to construct and reliably
operate the eligible renewable energy resource, including the
developer's experience, the feasibility of the technology used to
generate electricity, and the risk that the facility will not be
built, or that construction will be delayed, with the result that
electricity will not be supplied as required by the contract.
   (iv) Workforce recruitment, training, and retention efforts,
including the employment growth associated with the construction and
operation of eligible renewable energy resources and goals for
recruitment and training of women, minorities, and disabled veterans.

   (v) A nonzero integration cost adder methodology, to be initially
determined by the commission no later than October 1, 2015, that
reflects a reasonable estimate of the costs of procuring capacity and
energy required to accommodate the electrical generation of the
particular eligible renewable energy resource. 
   (B) Rules permitting retail sellers to accumulate, beginning
January 1, 2011, excess procurement in one compliance period to be
applied to any subsequent compliance period. The rules shall apply
equally to all retail sellers. In determining the quantity of excess
procurement for the applicable compliance period, the commission
shall deduct from actual procurement quantities, the total amount of
procurement associated with contracts of less than 10 years in
duration. In no event shall electricity products meeting the
portfolio content of paragraph (3) of subdivision (b) of Section
399.16 be counted as excess procurement.
   (C) Standard terms and conditions to be used by all electrical
corporations in contracting for eligible renewable energy resources,
including performance requirements for renewable generators. A
contract for the purchase of electricity generated by an eligible
renewable energy resource, at a minimum, shall include the renewable
energy credits associated with all electricity generation specified
under the contract. The standard terms and conditions shall include
the requirement that, no later than six months after the commission's
approval of an electricity purchase agreement entered into pursuant
to this article, the following information about the agreement shall
be disclosed by the commission: party names, resource type, project
location, and project capacity.
   (D) An appropriate minimum margin of procurement above the minimum
procurement level necessary to comply with the renewables portfolio
standard to mitigate the risk that renewable projects planned or
under contract are delayed or canceled. This paragraph does not
preclude an electrical corporation from voluntarily proposing a
margin of procurement above the appropriate minimum margin
established by the commission.
   (5) Consistent with the goal of increasing California's reliance
on eligible renewable energy resources, the renewable energy
procurement plan submitted by an electrical corporation shall include
all of the following:
   (A) An assessment of annual or multiyear portfolio supplies and
demand to determine the optimal mix of eligible renewable energy
resources with deliverability characteristics that may include
peaking, dispatchable, baseload, firm, and as-available capacity.
   (B) Potential compliance delays related to the conditions
described in paragraph  (4)   (5)  of
subdivision (b) of Section 399.15.
   (C) A bid solicitation setting forth the need for eligible
renewable energy resources of each deliverability characteristic,
required online dates, and locational preferences, if any.
   (D) A status update on the development schedule of all eligible
renewable energy resources currently under contract.
   (E) Consideration of mechanisms for price adjustments associated
with the costs of key components for eligible renewable energy
resource projects with online dates more than 24 months after the
date of contract execution.
   (F) An assessment of the risk that an eligible renewable energy
resource will not be built, or that construction will be delayed,
with the result that electricity will not be delivered as required by
the contract.
   (6) In soliciting and procuring eligible renewable energy
resources, each electrical corporation shall offer contracts of no
less than 10 years duration, unless the commission approves of a
contract of shorter duration.
   (7) In soliciting and procuring eligible renewable energy
resources for California-based projects, each electrical corporation
shall give preference to renewable energy projects that provide
environmental and economic benefits to communities afflicted with
poverty or high unemployment, or that suffer from high emission
levels of toxic air contaminants, criteria air pollutants, and
greenhouse gases.
   (b) A retail seller may enter into a combination of long- and
short-term contracts for electricity and associated renewable energy
credits. The commission may authorize a retail seller to enter into a
contract of less than 10 years' duration with an eligible renewable
energy resource, if the commission has established, for each retail
seller, minimum quantities of eligible renewable energy resources to
be procured through contracts of at least 10 years' duration.
   (c) The commission shall review and accept, modify, or reject each
electrical corporation's renewable energy resource procurement plan
prior to the commencement of renewable energy procurement pursuant to
this article by an electrical corporation.
   (d) Unless previously preapproved by the commission, an electrical
corporation shall submit a contract for the generation of an
eligible renewable energy resource to the commission for review and
approval consistent with an approved renewable energy resource
procurement plan. If the commission determines that the bid prices
are elevated due to a lack of effective competition among the
bidders, the commission shall direct the electrical corporation to
renegotiate the contracts or conduct a new solicitation.
   (e) If an electrical corporation fails to comply with a commission
order adopting a renewable energy resource procurement plan, the
commission shall exercise its authority pursuant to Section 2113 to
require compliance. The commission shall enforce comparable penalties
on any retail seller that is not an electrical corporation that
fails to meet the procurement targets established pursuant to Section
399.15.
   (f) (1) The commission may authorize a procurement entity to enter
into contracts on behalf of customers of a retail seller for
electricity products from eligible renewable energy resources to
satisfy the retail seller's renewables portfolio standard procurement
requirements. The commission shall not require any person or
corporation to act as a procurement entity or require any party to
purchase eligible renewable energy resources from a procurement
entity.
   (2) Subject to review and approval by the commission, the
procurement entity shall be permitted to recover reasonable
administrative and procurement costs through the retail rates of
end-use customers that are served by the procurement entity and are
directly benefiting from the procurement of eligible renewable energy
resources.
   (g) Procurement and administrative costs associated with contracts
entered into by an electrical corporation for eligible renewable
energy resources pursuant to this article and approved by the
commission are reasonable and prudent and shall be recoverable in
rates.
   (h) Construction, alteration, demolition, installation, and repair
work on an eligible renewable energy resource that receives
production incentives pursuant to Section 25742 of the Public
Resources Code, including work performed to qualify, receive, or
maintain production incentives, are "public works" for the purposes
of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2
of the Labor Code.
   SEC. 3.    Section 399.15 of the   Public
Utilities Code   is amended to read: 
   399.15.  (a) In order to fulfill unmet long-term resource needs,
the commission shall establish a renewables portfolio standard
requiring all retail sellers to procure a minimum quantity of
electricity products from eligible renewable energy resources as a
specified percentage of total kilowatthours sold to their retail
end-use customers each compliance period to achieve the targets
established under this article. For any retail seller procuring at
least 14 percent of retail sales from eligible renewable energy
resources in 2010, the deficits associated with any previous
renewables portfolio standard shall not be added to any procurement
requirement pursuant to this article.
   (b) The commission shall implement renewables portfolio standard
procurement requirements only as follows:
   (1) Each retail seller shall procure a minimum quantity of
eligible renewable energy resources for each of the following
compliance periods:
   (A) January 1, 2011, to December 31, 2013, inclusive.
   (B) January 1, 2014, to December 31, 2016, inclusive.
   (C) January 1, 2017, to December 31, 2020, inclusive.
   (2) (A) No later than January 1, 2012, the commission shall
establish the quantity of electricity products from eligible
renewable energy resources to be procured by the retail seller for
each compliance period. These quantities shall be established in the
same manner for all retail sellers and result in the same percentages
used to establish compliance period quantities for all retail
sellers.
   (B) In establishing quantities for the compliance period from
January 1, 2011, to December 31, 2013, inclusive, the commission
shall require procurement for each retail seller equal to an average
of 20 percent of retail sales. For the following compliance periods,
the quantities shall reflect reasonable progress in each of the
intervening years sufficient to ensure that the procurement of
electricity products from eligible renewable energy resources
achieves 25 percent of retail sales by December 31, 2016, and 33
percent of retail sales by December 31, 2020. The commission shall
require retail sellers to procure not less than 33 percent of retail
sales of electricity products from eligible renewable energy
resources in all subsequent years.
   (C) Retail sellers shall be obligated to procure no less than the
quantities associated with all intervening years by the end of each
compliance period. Retail sellers shall not be required to
demonstrate a specific quantity of procurement for any individual
intervening year.
   (3) The commission may require the procurement of eligible
renewable energy resources in excess of the quantities specified in
paragraph (2).  Prior to approving any procurement of eligible
renewable energy resources that would be in excess of the quantities
specified in paragraph (2), the commission shall consider the nonzero
integrated cost adder methodology determined pursuant to clause (v)
of subparagraph (A) of paragraph (4) of subdivision (a) of Section
399.13. 
   (4) Only for purposes of establishing the renewables portfolio
standard procurement requirements of paragraph (1) and determining
the quantities pursuant to paragraph (2), the commission shall
include all electricity sold to retail customers by the Department of
Water Resources pursuant to Division 27 (commencing with Section
80000) of the Water Code in the calculation of retail sales by an
electrical corporation.
   (5) The commission shall waive enforcement of this section if it
finds that the retail seller has demonstrated any of the following
conditions are beyond the control of the retail seller and will
prevent compliance:
   (A) There is inadequate transmission capacity to allow for
sufficient electricity to be delivered from proposed eligible
renewable energy resource projects using the current operational
protocols of the Independent System Operator. In making its findings
relative to the existence of this condition with respect to a retail
seller that owns transmission lines, the commission shall consider
both of the following:
   (i) Whether the retail seller has undertaken, in a timely fashion,
reasonable measures under its control and consistent with its
obligations under local, state, and federal laws and regulations, to
develop and construct new transmission lines or upgrades to existing
lines intended to transmit electricity generated by eligible
renewable energy resources. In determining the reasonableness of a
retail seller's actions, the commission shall consider the retail
seller's expectations for full-cost recovery for these transmission
lines and upgrades.
   (ii) Whether the retail seller has taken all reasonable
operational measures to maximize cost-effective deliveries of
electricity from eligible renewable energy resources in advance of
transmission availability.
   (B) Permitting, interconnection, or other circumstances that delay
procured eligible renewable energy resource projects, or there is an
insufficient supply of eligible renewable energy resources available
to the retail seller. In making a finding that this condition
prevents timely compliance, the commission shall consider whether the
retail seller has done all of the following:
   (i) Prudently managed portfolio risks, including relying on a
sufficient number of viable projects.
   (ii) Sought to develop one of the following: its own eligible
renewable energy resources, transmission to interconnect to eligible
renewable energy resources, or energy storage used to integrate
eligible renewable energy resources. This clause shall not require an
electrical corporation to pursue development of eligible renewable
energy resources pursuant to Section 399.14.
   (iii) Procured an appropriate minimum margin of procurement above
the minimum procurement level necessary to comply with the renewables
portfolio standard to compensate for foreseeable delays or
insufficient supply.
   (iv) Taken reasonable measures, under the control of the retail
seller, to procure cost-effective distributed generation and
allowable unbundled renewable energy credits.
   (C) Unanticipated curtailment of eligible renewable energy
resources necessary to address the needs of a balancing authority.
   (6) If the commission waives the compliance requirements of this
section, the commission shall establish additional reporting
requirements on the retail seller to demonstrate that all reasonable
actions under the control of the retail seller are taken in each of
the intervening years sufficient to satisfy future procurement
requirements.
   (7) The commission shall not waive enforcement pursuant to this
section, unless the retail seller demonstrates that it has taken all
reasonable actions under its control, as set forth in paragraph (5),
to achieve full compliance.
   (8) If a retail seller fails to procure sufficient eligible
renewable energy resources to comply with a procurement requirement
pursuant to paragraphs (1) and (2) and fails to obtain an order from
the commission waiving enforcement pursuant to paragraph (5), the
commission shall exercise its authority pursuant to Section 2113.
   (9) Deficits associated with the compliance period shall not be
added to a future compliance period.
   (c) The commission shall establish a limitation for each
electrical corporation on the procurement expenditures for all
eligible renewable energy resources used to comply with the
renewables portfolio standard. In establishing this limitation, the
commission shall rely on the following:
   (1) The most recent renewable energy procurement plan.
   (2) Procurement expenditures that approximate the expected cost of
building, owning, and operating eligible renewable energy resources.

   (3) The potential that some planned resource additions may be
delayed or canceled.
   (d) In developing the limitation pursuant to subdivision (c), the
commission shall ensure all of the following:
   (1) The limitation is set at a level that prevents
disproportionate rate impacts.
   (2) The costs of all procurement credited toward achieving the
renewables portfolio standard are counted towards the limitation.
   (3) Procurement expenditures do not include any indirect expenses,
including imbalance energy charges, sale of excess energy, decreased
generation from existing resources, transmission upgrades, or the
costs associated with relicensing any utility-owned hydroelectric
facilities.
   (e) (1) No later than January 1, 2016, the commission shall
prepare a report to the Legislature assessing whether each electrical
corporation can achieve a 33-percent renewables portfolio standard
by December 31, 2020, and maintain that level thereafter, within the
adopted cost limitations. If the commission determines that it is
necessary to change the limitation for procurement costs incurred by
any electrical corporation after that date, it may propose a revised
cap consistent with the criteria in subdivisions (c) and (d). The
proposed modifications shall take effect no earlier than January 1,
2017.
   (2) Notwithstanding Section 10231.5 of the Government Code, the
requirement for submitting a report imposed under paragraph (1) is
inoperative on January 1, 2021.
   (3) A report to be submitted pursuant to paragraph (1) shall be
submitted in compliance with Section 9795 of the Government Code.
   (f) If the cost limitation for an electrical corporation is
insufficient to support the projected costs of meeting the renewables
portfolio standard procurement requirements, the electrical
corporation may refrain from entering into new contracts or
constructing facilities beyond the quantity that can be procured
within the limitation, unless eligible renewable energy resources can
be procured without exceeding a de minimis increase in rates,
consistent with the long-term procurement plan established for the
electrical corporation pursuant to Section 454.5.
   (g) (1) The commission shall monitor the status of the cost
limitation for each electrical corporation in order to ensure
compliance with this article.
   (2) If the commission determines that an electrical corporation
may exceed its cost limitation prior to achieving the renewables
portfolio standard procurement requirements, the commission shall do
both of the following within 60 days of making that determination:
   (A) Investigate and identify the reasons why the electrical
corporation may exceed its annual cost limitation.
   (B) Notify the appropriate policy and fiscal committees of the
Legislature that the electrical corporation may exceed its cost
limitation, and include the reasons why the electrical corporation
may exceed its cost limitation.
   (h) The establishment of a renewables portfolio standard shall not
constitute implementation by the commission of the federal Public
Utility Regulatory Policies Act of 1978 (Public Law 95-617).
   SEC. 4.    Section 454.5 of the   Public
Utilities Code   is amended to read: 
   454.5.  (a) The commission shall specify the allocation of
electricity, including quantity, characteristics, and duration of
electricity delivery, that the Department of Water Resources shall
provide under its power purchase agreements to the customers of each
electrical corporation, which shall be reflected in the electrical
corporation's proposed procurement plan. Each electrical corporation
shall file a proposed procurement plan with the commission not later
than 60 days after the commission specifies the allocation of
electricity. The proposed procurement plan shall specify the date
that the electrical corporation intends to resume procurement of
electricity for its retail customers, consistent with its obligation
to serve. After the commission's adoption of a procurement plan, the
commission shall allow not less than 60 days before the electrical
corporation resumes procurement pursuant to this section.
   (b) An electrical corporation's proposed procurement plan shall
include, but not be limited to, all of the following:
   (1) An assessment of the price risk associated with the electrical
corporation's portfolio, including any utility-retained generation,
existing power purchase and exchange contracts, and proposed
contracts or purchases under which an electrical corporation will
procure electricity, electricity demand reductions, and
electricity-related products and the remaining open
                           position to be served by spot market
transactions.
   (2) A definition of each electricity product, electricity-related
product, and procurement related financial product, including support
and justification for the product type and amount to be procured
under the plan.
   (3) The duration of the plan.
   (4) The duration, timing, and range of quantities of each product
to be procured.
   (5) A competitive procurement process under which the electrical
corporation may request bids for procurement-related services,
including the format and criteria of that procurement process.
   (6) An incentive mechanism, if any incentive mechanism is
proposed, including the type of transactions to be covered by that
mechanism, their respective procurement benchmarks, and other
parameters needed to determine the sharing of risks and benefits.
   (7) The upfront standards and criteria by which the acceptability
and eligibility for rate recovery of a proposed procurement
transaction will be known by the electrical corporation prior to
execution of the transaction. This shall include an expedited
approval process for the commission's review of proposed contracts
and subsequent approval or rejection thereof. The electrical
corporation shall propose alternative procurement choices in the
event a contract is rejected.
   (8) Procedures for updating the procurement plan.
   (9) A showing that the procurement plan will achieve the
following:
   (A) The electrical corporation, in order to fulfill its unmet
resource needs, shall procure resources from eligible renewable
energy resources in an amount sufficient to meet its procurement
requirements pursuant to the California Renewables Portfolio Standard
Program (Article 16 (commencing with Section 399.11) of Chapter
2.3).
   (B) The electrical corporation shall create or maintain a
diversified procurement portfolio consisting of both short-term and
long-term electricity and electricity-related and demand reduction
products.
   (C) The electrical corporation shall first meet its unmet resource
needs through all available energy efficiency and demand reduction
resources that are cost effective, reliable, and feasible.
   (10) The electrical corporation's risk management policy,
strategy, and practices, including specific measures of price
stability.
   (11) A plan to achieve appropriate increases in diversity of
ownership and diversity of fuel supply of nonutility electrical
generation.
   (12) A mechanism for recovery of reasonable administrative costs
related to procurement in the generation component of rates.
   (c) The commission shall review and accept, modify, or reject each
electrical corporation's procurement plan. The commission's review
shall consider each electrical corporation's individual procurement
situation, and shall give strong consideration to that situation in
determining which one or more of the features set forth in this
subdivision shall apply to that electrical corporation. A procurement
plan approved by the commission shall contain one or more of the
following features, provided that the commission may not approve a
feature or mechanism for an electrical corporation if it finds that
the feature or mechanism would impair the restoration of an
electrical corporation's creditworthiness or would lead to a
deterioration of an electrical corporation's creditworthiness:
   (1) A competitive procurement process under which the electrical
corporation may request bids for procurement-related services. The
commission shall specify the format of that procurement process, as
well as criteria to ensure that the auction process is open and
adequately subscribed. Any purchases made in compliance with the
commission-authorized process shall be recovered in the generation
component of rates.
   (2) An incentive mechanism that establishes a procurement
benchmark or benchmarks and authorizes the electrical corporation to
procure from the market, subject to comparing the electrical
corporation's performance to the commission-authorized benchmark or
benchmarks. The incentive mechanism shall be clear, achievable, and
contain quantifiable objectives and standards. The incentive
mechanism shall contain balanced risk and reward incentives that
limit the risk and reward of an electrical corporation.
   (3) Upfront achievable standards and criteria by which the
acceptability and eligibility for rate recovery of a proposed
procurement transaction will be known by the electrical corporation
prior to the execution of the bilateral contract for the transaction.
The commission shall provide for expedited review and either approve
or reject the individual contracts submitted by the electrical
corporation to ensure compliance with its procurement plan. To the
extent the commission rejects a proposed contract pursuant to this
criteria, the commission shall designate alternative procurement
choices obtained in the procurement plan that will be recoverable for
ratemaking purposes.
   (d) A procurement plan approved by the commission shall accomplish
each of the following objectives:
   (1) Enable the electrical corporation to fulfill its obligation to
serve its customers at just and reasonable rates.
   (2) Eliminate the need for after-the-fact reasonableness reviews
of an electrical corporation's actions in compliance with an approved
procurement plan, including resulting electricity procurement
contracts, practices, and related expenses. However, the commission
may establish a regulatory process to verify and ensure that each
contract was administered in accordance with the terms of the
contract, and contract disputes that may arise are reasonably
resolved.
   (3) Ensure timely recovery of prospective procurement costs
incurred pursuant to an approved procurement plan. The commission
shall establish rates based on forecasts of procurement costs adopted
by the commission, actual procurement costs incurred, or combination
thereof, as determined by the commission. The commission shall
establish power procurement balancing accounts to track the
differences between recorded revenues and costs incurred pursuant to
an approved procurement plan. The commission shall review the power
procurement balancing accounts, not less than semiannually, and shall
adjust rates or order refunds, as necessary, to promptly amortize a
balancing account, according to a schedule determined by the
commission. Until January 1, 2006, the commission shall ensure that
any overcollection or undercollection in the power procurement
balancing account does not exceed 5 percent of the electrical
corporation's actual recorded generation revenues for the prior
calendar year excluding revenues collected for the Department of
Water Resources. The commission shall determine the schedule for
amortizing the overcollection or undercollection in the balancing
account to ensure that the 5 percent threshold is not exceeded. After
January 1, 2006, this adjustment shall occur when deemed appropriate
by the commission consistent with the objectives of this section.
   (4) Moderate the price risk associated with serving its retail
customers, including the price risk embedded in its long-term supply
contracts, by authorizing an electrical corporation to enter into
financial and other electricity-related product contracts.
   (5) Provide for just and reasonable rates, with an appropriate
balancing of price stability and price level in the electrical
corporation's procurement plan.
   (e) The commission shall provide for the periodic review and
prospective modification of an electrical corporation's procurement
plan.
   (f) The commission may engage an independent consultant or
advisory service to evaluate risk management and strategy. The
reasonable costs of any consultant or advisory service is a
reimbursable expense and eligible for funding pursuant to Section
631.
   (g) The commission shall adopt appropriate procedures to ensure
the confidentiality of any market sensitive information submitted in
an electrical corporation's proposed procurement plan or resulting
from or related to its approved procurement plan, including, but not
limited to, proposed or executed power purchase agreements, data
request responses, or consultant reports, or any combination,
provided that the Office of Ratepayer Advocates and other consumer
groups that are nonmarket participants shall be provided access to
this information under confidentiality procedures authorized by the
commission.
   (h) Nothing in this section alters, modifies, or amends the
commission's oversight of affiliate transactions under its rules and
decisions or the commission's existing authority to investigate and
penalize an electrical corporation's alleged fraudulent activities,
or to disallow costs incurred as a result of gross incompetence,
fraud, abuse, or similar grounds. Nothing in this section expands,
modifies, or limits the State Energy Resources Conservation and
Development Commission's existing authority and responsibilities as
set forth in Sections 25216, 25216.5, and 25323 of the Public
Resources Code.
   (i) An electrical corporation that serves less than 500,000
electric retail customers within the state may file with the
commission a request for exemption from this section, which the
commission shall grant upon a showing of good cause.
   (j) (1) Prior to its approval pursuant to Section 851 of any
divestiture of generation assets owned by an electrical corporation
on or after the date of enactment of the act adding this section, the
commission shall determine the impact of the proposed divestiture on
the electrical corporation's procurement rates and shall approve a
divestiture only to the extent it finds, taking into account the
effect of the divestiture on procurement rates, that the divestiture
is in the public interest and will result in net ratepayer benefits.
   (2) Any electrical corporation's procurement necessitated as a
result of the divestiture of generation assets on or after the
effective date of the act adding this subdivision shall be subject to
the mechanisms and procedures set forth in this section only if its
actual cost is less than the recent historical cost of the divested
generation assets.
   (3) Notwithstanding paragraph (2), the commission may deem
proposed procurement eligible to use the procedures in this section
upon its approval of asset divestiture pursuant to Section 851. 
   (k) The commission shall direct electrical corporations to include
in their proposed procurement plans the use of any nonzero
integration cost adders determined pursuant to clause (v) of
subparagraph (A) of paragraph (4) of subdivision (a) of Section
399.13.  
  SECTION 1.    (a) The Legislature finds and
declares all of the following:
   (1) Forests are critical elements of the California economy and
ecosystems.
   (2) Forest fires have devastated large tracts of California's
forested land, a trend that has exacerbated in recent years. Fourteen
of the 20 largest recorded wildfires in California's history have
occurred within the last 20 years.
   (3) Climate change is likely to increase the risk of wildfire by
disrupting rain cycles, increasing average temperatures and dry
season duration, and forcing changes in species' habitat range.
   (b) It is the intent of the Legislature to promote the use of
biomass generated from activities that reduce the risk of wildfire
for the purposes of renewable energy production for activities that
do not harm the long-term ecological health and sustainability of the
forest.  
  SEC. 2.    Section 38575 is added to the Health
and Safety Code, to read:
   38575.  (a) As used in this section, "biochar" means biomass that
is a solid carbonaceous byproduct of pyrolysis or gasification that
may be used as a feedstock for renewable energy generation.
   (b) The state board shall adopt regulations providing for the
generation of offset credits that may be used, sold, or traded
pursuant to a market-based compliance mechanism that the state board
may adopt pursuant to this part for both of the following:
   (1) (A) Forest management activities that are performed for the
purpose of reducing the risk of severe wildlife that include, but are
not limited to, underbrush removal, dead tree removal, and selective
thinning of tree stands.
   (B) Activities receiving offset credits shall be performed in
compliance with all applicable laws and regulations, including the Z'
berg-Nejedly Forest Practice Act of 1973 (Chapter 8 (commencing with
Section 4511) of Part 2 of Division 4 of the Public Resources Code).
   (C) The amount of offset credits generated shall be in proportion
to the expected reduction in the emissions of greenhouse gases due to
the decreased likelihood of severe wildfires resulting from the
activities.
   (D) The offset credits shall be issued to the entity performing
the activities.
   (2) (A) Application of biochar to soil that is in compliance with
all applicable laws and regulations and the best management practices
for the management of the soil.
   (B) The amount of offset credits generated shall equal the
expected long-term sequestration of carbon in soils to which the
biochar is applied.