Amended in Assembly April 6, 2015

California Legislature—2015–16 Regular Session

Assembly BillNo. 1333


Introduced by Assembly Member Quirk

February 27, 2015


An act tobegin delete amend Section 399.20end deletebegin insert add Chapter 6 (commencing with Section 8390) to Division 4.1end insert of the Public Utilities Code, relating to energy.

LEGISLATIVE COUNSEL’S DIGEST

AB 1333, as amended, Quirk. begin deleteRenewable energy. end deletebegin insertEnergy efficiency programs.end insert

begin insert

Existing law requires the Public Utilities Commission, in consultation with the State Energy Resources Conservation and Development Commission, to identify all potential cost-effective energy efficiency savings and establish efficiency targets for an electrical or gas corporation. Existing law requires a local publicly owned electric utility, in procuring energy, to acquire all cost-effective energy efficiency and demand response resources that are cost-effective, reliable, and feasible.

end insert
begin insert

This bill would require electric and gas corporations and local publicly owned electric and gas utilities to require recipients of rebates or incentives from their residential or commercial energy efficiency or weatherization programs to install demand response infrastructure on the property for which the rebates or incentives are provided.

end insert
begin delete

Under the Public Utilities Act, electrical corporations are required to file with the Public Utilities Commission a standard tariff for electricity purchased from certain electric generation facilities. The act declares it is the policy of this state and the intent of the Legislature to encourage electrical generation from eligible renewable energy resources.

end delete
begin delete

This bill would specifically include in those eligible renewable energy resources those that can be used to meet peak demand. The bill also would make nonsubstantive changes and would correct erroneous cross-references.

end delete

Vote: majority. Appropriation: no. Fiscal committee: begin deleteno end deletebegin insertyesend insert. State-mandated local program: no.

The people of the State of California do enact as follows:

P2    1begin insert

begin insertSECTION 1.end insert  

end insert

begin insertChapter 6 (commencing with Section 8390) is
2added to Division 4.1 of the end insert
begin insertPublic Utilities Codeend insertbegin insert, to read:end insert

begin insert

3 

4Chapter  begin insert6.end insert Energy Efficiency Programs and Demand
5Response
6

 

7

begin insert8390.end insert  

(a) An electrical or gas corporation shall require
8recipients of rebates or incentives from residential or commercial
9energy efficiency or weatherization programs of the electrical or
10gas corporation, not including programs for appliance
11replacement, to install demand response infrastructure on the
12property for which the rebates or incentives are provided.

13(b) A local publicly owned electric or gas utility shall require
14recipients of rebates or incentives from residential or commercial
15energy efficiency or weatherization programs of the utility, not
16including programs for appliance replacement, to install demand
17response infrastructure on the property for which the rebates or
18incentives are provided.

end insert
begin delete
19

SECTION 1.  

Section 399.20 of the Public Utilities Code is
20amended to read:

21

399.20.  

(a) It is the policy of this state and the intent of the
22Legislature to encourage electrical generation from eligible
23renewable energy resources, including renewable energy resources
24that can be used to meet peak demand.

25(b) As used in this section, “electric generation facility” means
26an electric generation facility located within the service territory
27of, and developed to sell electricity to, an electrical corporation
28that meets all of the following criteria:

29(1) Has an effective capacity of not more than three megawatts.

30(2) Is interconnected and operates in parallel with the electrical
31transmission and distribution grid.

P3    1(3) Is strategically located and interconnected to the electrical
2transmission and distribution grid in a manner that optimizes the
3deliverability of electricity generated at the facility to load centers.

4(4) Is an eligible renewable energy resource.

5(c) An electrical corporation shall file with the commission a
6standard tariff for electricity purchased from an electric generation
7facility. The commission may modify or adjust the requirements
8of this section for an electrical corporation with less than 100,000
9service connections, as individual circumstances merit.

10(d) (1) The tariff shall provide for payment for every
11kilowatthour of electricity purchased from an electric generation
12facility for a period of 10, 15, or 20 years, as authorized by the
13commission. The payment shall be the market price determined
14by the commission pursuant to paragraph (2) and shall include all
15current and anticipated environmental compliance costs, including,
16but not limited to, mitigation of emissions of greenhouse gases
17and air pollution offsets associated with the operation of new
18generating facilities in the local air pollution control or air quality
19management district where the electric generation facility is
20located.

21(2) The commission shall establish a methodology to determine
22the market price of electricity for terms corresponding to the length
23of contracts with an electric generation facility, in consideration
24of the following:

25(A) The long-term market price of electricity for fixed price
26contracts, determined pursuant to an electrical corporation’s general
27procurement activities, as authorized by the commission.

28(B) The long-term ownership, operating, and fixed-price fuel
29costs associated with fixed-price electricity from new generating
30facilities.

31(C) The value of different electricity products including
32baseload, peaking, and as-available electricity.

33(3) The commission may adjust the payment rate to reflect the
34value of every kilowatthour of electricity generated on a
35time-of-delivery basis.

36(4) The commission shall ensure, with respect to rates and
37charges, that ratepayers that do not receive service pursuant to the
38tariff are indifferent to whether a ratepayer with an electric
39generation facility receives service pursuant to the tariff.

P4    1(e) An electrical corporation shall provide expedited
2interconnection procedures to an electric generation facility located
3on a distribution circuit that generates electricity at a time and in
4a manner so as to offset the peak demand on the distribution circuit,
5 if the electrical corporation determines that the electric generation
6facility will not adversely affect the distribution grid. The
7commission shall consider, and may establish, a value for an
8electric generation facility located on a distribution circuit that
9generates electricity at a time and in a manner so as to offset the
10peak demand on the distribution circuit.

11(f) (1) An electrical corporation shall make the tariff available
12to the owner or operator of an electric generation facility within
13the service territory of the electrical corporation, upon request, on
14a first-come-first-served basis, until the electrical corporation meets
15its proportionate share of a statewide cap of 750 megawatts
16cumulative rated generation capacity served under this section and
17Section 399.32. The proportionate share shall be calculated based
18on the ratio of the electrical corporation’s peak demand compared
19to the total statewide peak demand.

20(2) By June 1, 2013, the commission shall, in addition to the
21750 megawatts identified in paragraph (1), direct the electrical
22corporations to collectively procure at least 250 megawatts of
23cumulative rated generating capacity from developers of bioenergy
24projects that commence operation on or after June 1, 2013. The
25commission shall, for each electrical corporation, allocate shares
26of the additional 250 megawatts based on the ratio of each electrical
27corporation’s peak demand compared to the total statewide peak
28demand. In implementing this paragraph, the commission shall do
29all of the following:

30(A) Allocate the 250 megawatts identified in this paragraph
31among the electrical corporations based on the following
32categories:

33(i) For biogas from wastewater treatment, municipal organic
34waste diversion, food processing, and codigestion, 110 megawatts.

35(ii) For dairy and other agricultural bioenergy, 90 megawatts.

36(iii) For bioenergy using byproducts of sustainable forest
37management, 50 megawatts. Allocations under this category shall
38be determined based on the proportion of bioenergy that sustainable
39forest management providers derive from sustainable forest
P5    1management in fire threat treatment areas, as designated by the
2Department of Forestry and Fire Protection.

3(B) Direct the electrical corporations to develop standard
4contract terms and conditions that reflect the operational
5characteristics of the projects, and to provide a streamlined
6contracting process.

7(C) Coordinate, to the maximum extent feasible, any incentive
8or subsidy programs for bioenergy with the agencies listed in
9subparagraph (A) of paragraph (3) to provide maximum benefits
10to ratepayers and to ensure that incentives are used to reduce
11contract prices.

12(D) The commission shall encourage gas and electrical
13corporations to develop and offer programs and services to facilitate
14development of in-state biogas for a broad range of purposes.

15(3) (A) The commission, in consultation with the Energy
16Commission, the State Air Resources Board, the Department of
17Forestry and Fire Protection, the Department of Food and
18Agriculture, and the Department of Resources Recycling and
19Recovery, may review the allocations of the 250 additional
20megawatts identified in paragraph (2) to determine if those
21allocations are appropriate.

22(B) If the commission finds that the allocations of the 250
23additional megawatts identified in paragraph (2) are not
24appropriate, the commission may reallocate the 250 megawatts
25among the categories established in subparagraph (A) of paragraph
26(2).

27(4) For purposes of this subdivision, “bioenergy” means biogas
28and biomass.

29(g) The electrical corporation may make the terms of the tariff
30available to owners and operators of an electric generation facility
31in the form of a standard contract subject to commission approval.

32(h) Every kilowatthour of electricity purchased from an electric
33generation facility shall count toward meeting the electrical
34corporation’s renewables portfolio standard annual procurement
35targets for purposes of paragraph (1) of subdivision (b) of Section
36399.15.

37(i) The physical generating capacity of an electric generation
38facility shall count toward the electrical corporation’s resource
39adequacy requirement for purposes of Section 380.

P6    1(j) (1) The commission shall establish performance standards
2for any electric generation facility that has a capacity greater than
3one megawatt to ensure that those facilities are constructed,
4operated, and maintained to generate the expected annual net
5production of electricity and do not impact system reliability.

6(2) The commission may reduce the three megawatt capacity
7limitation of paragraph (1) of subdivision (b) if the commission
8finds that a reduced capacity limitation is necessary to maintain
9system reliability within that electrical corporation’s service
10territory.

11(k) (1) An owner or operator of an electric generation facility
12that received ratepayer-funded incentives in accordance with
13Section 379.6 of this code, or with Section 25782 of the Public
14Resources Code, and participated in a net metering program
15pursuant to Sections 2827 and 2827.10 of, and former Section
162827.9 of, this code before January 1, 2010, shall be eligible for
17a tariff or standard contract filed by an electrical corporation
18pursuant to this section.

19(2) In establishing the tariffs or standard contracts pursuant to
20this section, the commission shall consider ratepayer-funded
21incentive payments previously received by the generation facility
22pursuant to Section 379.6 of this code or Section 25782 of the
23Public Resources Code. The commission shall require
24reimbursement of any funds received from these incentive
25programs to an electric generation facility, in order for that facility
26to be eligible for a tariff or standard contract filed by an electrical
27corporation pursuant to this section, unless the commission
28determines ratepayers have received sufficient value from the
29incentives provided to the facility based on how long the project
30has been in operation and the amount of renewable electricity
31previously generated by the facility.

32(3) A customer that receives service under a tariff or contract
33approved by the commission pursuant to this section is not eligible
34to participate in a net metering program.

35(l) An owner or operator of an electric generation facility
36electing to receive service under a tariff or contract approved by
37the commission shall continue to receive service under the tariff
38or contract until either of the following occurs:

P7    1(1) The owner or operator of an electric generation facility no
2longer meets the eligibility requirements for receiving service
3pursuant to the tariff or contract.

4(2) The period of service established by the commission pursuant
5to subdivision (d) is completed.

6(m) Within 10 days of receipt of a request for a tariff pursuant
7to this section from an owner or operator of an electric generation
8facility, the electrical corporation that receives the request shall
9post a copy of the request on its Internet Web site. The information
10posted on the Internet Web site shall include the name of the city
11in which the facility is located, but information that is proprietary
12and confidential, including, but not limited to, address information
13beyond the name of the city in which the facility is located, shall
14be redacted.

15(n) An electrical corporation may deny a tariff request pursuant
16to this section if the electrical corporation makes any of the
17following findings:

18(1) The electric generation facility does not meet the
19requirements of this section.

20(2) The transmission or distribution grid that would serve as the
21point of interconnection is inadequate.

22(3) The electric generation facility does not meet all applicable
23state and local laws and building standards and utility
24interconnection requirements.

25(4) The aggregate of all electric generating facilities on a
26distribution circuit would adversely impact utility operation and
27load restoration efforts of the distribution system.

28(o) Upon receiving a notice of denial from an electrical
29corporation, the owner or operator of the electric generation facility
30denied a tariff pursuant to this section shall have the right to appeal
31that decision to the commission.

32(p) To ensure the safety and reliability of electric generation
33facilities, the owner of an electric generation facility receiving a
34tariff pursuant to this section shall provide an inspection and
35maintenance report to the electrical corporation at least once every
36other year. The inspection and maintenance report shall be prepared
37at the owner’s or operator’s expense by a California-licensed
38contractor who is not the owner or operator of the electric
39generation facility. A California-licensed electrician shall perform
40the inspection of the electrical portion of the generation facility.

P8    1(q) The contract between the electric generation facility
2receiving the tariff and the electrical corporation shall contain
3provisions that ensure that construction of the electric generating
4facility complies with all applicable state and local laws and
5building standards, and utility interconnection requirements.

6(r) (1) All construction and installation of facilities of the
7electrical corporation, including at the point of the output meter
8or at the transmission or distribution grid, shall be performed only
9by that electrical corporation.

10(2) All interconnection facilities installed on the electrical
11corporation’s side of the transfer point for electricity between the
12electrical corporation and the electrical conductors of the electric
13generation facility shall be owned, operated, and maintained only
14by the electrical corporation. The ownership, installation, operation,
15reading, and testing of revenue metering equipment for electric
16generating facilities shall only be performed by the electrical
17corporation.

end delete


O

    98