BILL NUMBER: SB 119	AMENDED
	BILL TEXT

	AMENDED IN ASSEMBLY  JULY 1, 2015
	AMENDED IN ASSEMBLY  JUNE 16, 2015
	AMENDED IN SENATE  JUNE 1, 2015
	AMENDED IN SENATE  MAY 12, 2015
	AMENDED IN SENATE  MAY 5, 2015
	AMENDED IN SENATE  APRIL 20, 2015
	AMENDED IN SENATE  APRIL 6, 2015

INTRODUCED BY   Senator Hill

                        JANUARY 14, 2015

   An act  to add Section 7110.7 to the Business and
Professions Code,  to amend Sections 4216, 4216.1, 4216.2,
4216.3, 4216.4, 4216.5, 4216.6, 4216.7, 4216.8, and 4216.9 of, and to
add Sections 4216.10, 4216.12, 4216.13, 4216.14, 4216.15, 4216.16,
4216.17, 4216.18, 4216.19, 4216.20, 4216.21, and 4216.22 to, the
Government Code, and to amend Section 1702.5 of, and to add Sections
320.5 and 971 to, the Public Utilities Code, relating to excavations.


	LEGISLATIVE COUNSEL'S DIGEST


   SB 119, as amended, Hill. Protection of subsurface installations.

   Existing law vests the Contractors' State License Board with all
functions and duties relating to the administration of the
Contractors' State License Law. Existing law authorizes the issuance
of licenses to applicants for contractors' licenses by written
examination under rules and regulations adopted by the board.
 
   This bill would require the board to adopt a program to enforce
violations of provisions relating to excavation. The bill would
authorize the board to require a contractor to undergo training, levy
a fine, and suspend a contractor's license for a violation.

   Existing law requires every operator of a subsurface installation,
except the Department of Transportation, to become a member of,
participate in, and share in the costs of, a regional notification
center. Existing law requires any person who plans to conduct any
excavation to contact the appropriate regional notification center
before commencing that excavation, as specified. Existing law defines
a subsurface installation as any underground pipeline, conduit,
duct, wire, or other structure. Existing law requires an operator of
a subsurface installation, who receives notification of proposed
excavation work, within 2 working days of that notification,
excluding weekends and holidays, to mark the approximate location and
number of subsurface installations that may be affected by the
excavation or to advise that no subsurface installations operated by
him or her would be affected. Existing law requires an operator of a
subsurface installation that has failed to comply with these
provisions to be liable to the excavator for damages, costs, and
expenses.
   This bill would declare the need to clarify and revise these
provisions. The bill would define and redefine various terms relating
to a regional notification center. The bill would expand the
definition of a subsurface installation, to include an underground
structure or submerged duct, pipeline, or structure, except as
specified.
   The bill would require an excavator planning to conduct an
excavation to delineate the area to be excavated before notifying the
appropriate regional notification center of the planned excavation,
as provided. The bill would require an operator, before the legal
start date and time of the excavation, to locate and field mark,
within the area delineated for excavation, its subsurface
installations. The bill would require an operator to maintain and
preserve all plans and records for any subsurface installation owned
by that operator as that information becomes known, as specified.
   This bill would prohibit an excavator that damages a subsurface
installation due to an inaccurate field mark, as defined, by an
operator from being liable for damages, replacement costs, or other
expenses arising from damage to the subsurface installation, provided
that the excavator complied with the provisions described above. The
bill would also authorize, in any action for reimbursement or
indemnification for a claim arising from damage to a subsurface
installation in which a court finds that the excavator complied with
those provisions, the excavator to be awarded reasonable attorney's
fees and expenses.
   The bill would delete the existing exemptions pertaining to an
owner of real property  and would instead exempt an owner of
residential real property  who, as part of improving his or her
principal residence, is performing, or is having performed, an
excavation using hand tools that does not require a permit, as
specified.
   The bill would require the operator of a high-priority subsurface
installation to make specified notifications to a landowner if
agricultural activities cannot safely be performed due to the depth
of the subsurface installations and to mark the location and depth of
those installations, as specified.
   The bill would also  authorize   require
 the Public Utilities Commission and the Office of the State
Fire Marshal to enforce the requirement to locate and field mark
subsurface installations and lines against operators of natural gas
and electric underground infrastructure and hazardous liquid
pipelines, unless these operators are municipal utilities.
   This bill would create the California Underground Facilities Safe
Excavation Advisory Committee under, and assisted by the staff of,
the Contractors' State License Board, in the Department of Consumer
Affairs. The bill would require the committee to coordinate education
and outreach activities, develop standards, and investigate
violations of the provisions described above, as specified.
   The advisory committee would be composed of 9 members who would
serve 2-year  terms.   terms, and one nonvoting
ex officio member who may be invited by the appointed members of the
committee.  The bill would authorize the advisory committee,
commencing on January 1, 2017, to use compliance audits in furthering
the purposes of these provisions. The bill would require the
advisory committee to conduct an annual meeting on or before February
1, 2017, and each year thereafter, to report to the Governor and the
Legislature on its activities and any recommendations.
   The bill would create the Safe Energy Infrastructure and
Excavation Fund in the State Treasury and would provide that moneys
deposited into the fund are to be used to cover the administrative
expenses of the advisory committee, upon appropriation by the
Legislature. The bill would authorize the commission to use excess
moneys in the fund for specified purposes relating to the safety of
underground utilities, upon appropriation by the Legislature.
   The Natural Gas Pipeline Safety Act of 2011, within the Public
Utilities Act, designates the Public Utilities Commission as the
state authority responsible for regulating and enforcing intrastate
gas pipeline transportation and pipeline facilities pursuant to
federal law, including the development, submission, and
administration of a state pipeline safety program certification for
natural gas. Existing federal law requires each operator of a buried
gas pipeline to carry out a program to prevent damage to that
pipeline from excavation activities, as specified.
   The bill would require each gas corporation, as part of its damage
prevention  program   program,  to collect
specified information to inform its outreach activities and to
report this information to the Public Utilities Commission, as
specified.
   Under existing law, a violation of the Public Utilities Act or any
order, decision, rule, direction, demand, or requirement of the
commission is a crime.
   Because the requirements described above are within the act, a
violation of these requirements would impose a state-mandated local
program by creating a new crime.
   Existing law requires the Public Utilities Commission to develop
and implement a safety enforcement program that is applicable to gas
corporations and electrical corporations and that includes procedures
for monitoring, data tracking and analysis, and investigations, as
well as issuance of citations by commission staff, under the
direction of the executive director of the commission, for correction
and punishment of safety violations. That law requires the
commission to develop and implement an appeals process to govern
issuance and appeal of citations, or resolution of corrective action
orders. That law requires the commission to implement the safety
enforcement program for gas safety by July 1, 2014, and for
electrical safety by January 1, 2015.
   This bill would require that moneys collected as a result of the
issuance of citations to gas corporations and electrical corporations
pursuant to the above-described law be deposited in the Safe Energy
Infrastructure and Excavation Fund.
   The bill would make other conforming changes.
   The California Constitution requires the state to reimburse local
agencies and school districts for certain costs mandated by the
state. Statutory provisions establish procedures for making that
reimbursement.
   This bill would provide that no reimbursement is required by this
act for a specified reason.
   Vote: majority. Appropriation: no. Fiscal committee: yes.
State-mandated local program: yes.


THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

  SECTION 1.  The Legislature finds and declares  all of 
the following: 
   (a) Discussions that have taken place since Article 2 (commencing
with Section 4216) of Chapter 3.1 of Division 5 of Title 1 of the
Government Code was added by Chapter 928 of the Statutes of 1989 have
led to widespread agreement that many of the provisions of the
article should be clarified.  
   (a) For the state's "one-call" law to be effective, it needs
greater clarity and effective enforcement, and it must foster
communication between operators of subsurface installations and the
various types of excavators in California. 
   (b) Regional notification centers, or "one-call" centers, have
developed means of electronic communication that improve the
efficiency of the "one-call" process, and statutory barriers to using
new methods of notification should be eliminated.
   (c) Electronic positive response is a means to communicate the
status of responses to an excavator's notice of excavation via the
one-call center and provides the safety benefit that an excavator has
an easy means to know whether or not all of the utilities within the
excavation area have marked their underground  facilities.
  installations. 
   (d) The delineation by an excavator of the area to be excavated in
advance of the field location and marking by subsurface facility
operators of their  facilities   installations
 aids the excavator in understanding where  underground
facilities   subsurface installations  were marked,
and thus improves safety. This practice was recommended by the
National Transportation Safety Board in its 1997 study "Protecting
Public Safety through Excavation Damage Prevention" and is a best
practice of the Common Ground Alliance.
   (e) Continuing an excavation after an excavation "ticket" has
expired does not promote safety, and excavators should renew their
ticket with the one-call center before expiration. Continuing
excavation when markings are no longer visible does not promote
safety, and excavators should stop work until the subsurface
installations are remarked. 
   (f) The benefits of eliminating old field marks once an excavation
project is complete are more than just aesthetic; eliminating old
field marks helps prevent confusion for the next excavator to dig in
that area.  
   (g) 
    (f)  Increased communication between subsurface
installation operators and excavators before breaking ground has
safety benefits. 
   (h) 
    (g)  Construction sites often have many parties
conducting different, ongoing work, and so the inherent safety risks
associated with that work can be increased by a failure of these
parties to effectively communicate. Excavators, operators of
subsurface  facilities,   installations, 
and locators have a responsibility to communicate with other parties
before entering these worksites, which may require advance schedule
coordination, and also have a responsibility to observe the safety
requirements set for those worksites. 
   (i) 
    (h)  Abandoned subsurface installations can be mistaken
for active subsurface installations that are marked, and thus present
a safety risk to excavators and the public. Safety will be improved
if subsurface facility operators identify these subsurface
installations when their existence is known. 
   (j) 
    (i)  The ability of an operator of subsurface 
facilities  installations  to locate and mark
affected  facilities   installations  can
be seriously impaired by a lack of high-quality records of those
 facilities,   installations,  and thus
operators should keep records of their facilities for as long as they
are in the ground, whether or not they are in use. 
   (k)
    (j)  Failure by an operator of subsurface 
facilities   installations  to mark the 
facilities   installations  within the required
two-working-day period is a serious breach of duty. 
   (l) 
    (k)  While  a utility   an 
operator has two working days after an excavator's call to the
one-call center to mark its  underground facilities,
  subsurface installations,  failure of that
 utility   operator  to do so does not
relieve the excavator of the safety responsibility to wait until the
 utility  operator has marked before commencing
excavation. 
   (m) 
    (l)  Mismarks by an operator place excavators and the
public at great safety risk, and so operators who mismark their
 facilities   installations  are entitled
to no award for any damages to those  facilities. 
 installations.  
   (n) 
    (m)   Facilities   Installations
 that are embedded in pavement require more extensive
communication  among operators, locators, and excavators  to
prevent  them   the installations  from
being damaged. 
   (o) 
    (n)  Exemptions that allow a class of persons to
excavate without calling 811  shall be made not based on
convenience, but rather   are to be  permitted only
if alternative procedures allow the excavation to take place without
compromising safety. 
   (p) 
    (o)  More communication is needed between the Department
of Transportation and the regional notification centers, including
the sharing of  facility location   subsurface
installation  information, so that excavators may be alerted of
possible Department of Transportation subsurface installations in the
area of planned excavation  and of   and, if
the excavation is to take place in a Department of Transportation
right-of-way,  the need to seek a Department of Transportation
encroachment permit. 
   (q) 
    (p)  Agricultural activities of less than 16 inches are
not excavations, and high-priority subsurface natural gas and
hazardous liquid pipeline installations are identified in rural areas
with above-ground markers pursuant to Section 192.707 of Part 192
and Section 195.410 of Part 195 of Title 49 of the Code of Federal
Regulations, respectively, so the management of safety around
 underground facilities   subsurface
installations in agricultural operations must be different.

   (r) 
    (q)  Prevention of boring through sewer laterals with
natural gas and other subsurface installation services may be
achieved through reasonable care in the use of trenchless excavating
technologies. Indication of the location of sewer laterals can aid in
prevention of these cross-bores. 
   (s) 
    (r)  The exemption that permits private property owners
to dig on their property without calling a regional notification
center to have the area marked for  underground facilities
  subsurface installations  does not have a basis
in safety. 
   (t) 
    (s)  The exemption that permits homeowners to conduct
excavation on their property with heavy machinery or when there is a
utility easement on his or her property does not have a basis in
safety. 
   (u) 
    (t)  Behaviors that are suspected to be unsafe, but upon
which there is not widespread agreement as to the level of risk and,
therefore, are unregulated, must be monitored to better assess the
risk. 
   (v) 
    (u)  The Study on the Impact of Excavation Damage on
Pipeline Safety, submitted by the United States Department of
Transportation to Congress on October 9, 2014, reported that other
states have found that exemption of landscape maintenance activities
of less than 12 inches deep, when performed with hand tools, 
do   does  not appear to have a significant impact
on safety. The report cautions, however, that while those
activity-based exemptions may be acceptable, they should be supported
by sufficient data. 
   (w) 
    (v)  Gas corporations have ready access to information
about damages that occur on their subsurface installations and should
collect relevant data to inform future discussions regarding the
risk of notification exemptions. 
   (x) 
    (w)  Other states have experienced a dramatic
improvement in safety after implementing centralized administrative
oversight of one-call laws. 
   (y) 
    (x)  California should have an advisory committee,
composed of excavation stakeholders, subject to oversight by the
Legislature and the Department of Finance, to perform three major
tasks, which are to coordinate the diverse education and outreach
efforts undertaken by state and local agencies, operators, and
excavators throughout the state and issue grants for targeted
efforts, to study excavation questions and develop standards that
clarify best practices, and to investigate potential violations of
the one-call law that inform both the standards it is to develop and
potential enforcement actions. Due to the size of the state, and in
order to reduce costs, the advisory committee should meet in northern
and southern California. 
   (z) 
    (y)  The advisory committee should not be funded through
the General Fund, but should be funded through fines levied on gas
and electric corporations for safety violations, instead of having
those fines go to the General Fund. 
  SEC. 2.    Section 7110.7 is added to the Business
and Professions Code, to read:
   7110.7.  (a) The Contractors' State License Board shall adopt a
program to enforce violations by contractors of subdivision (a) of
Section 4216.2 of the Government Code.
   (b) The Contractors' State License Board shall require contractors
to undergo a training program relating to compliance with
subdivision (a) of Section 4216.2 of the Government Code, as
determined by the board, for an initial violation. The training
program shall be conducted by a regional notification center, as
defined in Section 4216 of the Government Code, or by a training
program approved by a regional notification center.
   (c) If the contractor does not submit evidence of completion of a
training program within 30 days of being notified of the requirement
to do so, or fails to provide a reasonable explanation for his or her
delay in scheduling that training in writing, the contractor shall
be subject to further disciplinary action.
   (d) A subsequent violation within one calendar year of the first
violation, failure to attend training, or failure to pay fines
ultimately may result in suspension of the contractor's license.
   (e) The board shall determine a graduated scale of fines
consistent with Section 7099.2. 
   SEC. 3.   SEC. 2.   Section 4216 of the
Government Code is amended to read:
   4216.  As used in this article the following definitions apply:
   (a) "Abandoned subsurface installation" means a subsurface
installation that is no longer in service and is physically
disconnected from any active or inactive subsurface installation.
   (b) "Active subsurface installation" means a subsurface
installation currently in use or currently carrying service.
   (c) "Advisory Committee" means the California Underground
Facilities Safe Excavation Advisory Committee.
   (d) "Delineate" means to mark in white the location or path of the
proposed excavation using the guidelines in Appendix B of the
"Guidelines for Excavation Delineation" published in Best Practices
Version 11.0 by the Common Ground Alliance. If there is a conflict
between the marking practices in those guidelines and other
provisions of this article, this article shall control. "Delineation"
also includes physical identification of the area to be excavated
using pink marking, if an excavator makes a determination that
standard delineation may be misleading to those persons using
affected streets and highways, or be misinterpreted as a traffic or
pedestrian control, and the excavator has contacted the regional
notification center to advise the operators that the excavator will
physically identify the area to be excavated using pink markings.
   (e) "Electronic positive response" means an electronic response
from an operator to the regional notification center providing the
status of an operator's statutorily required response to a ticket.
   (f) (1) "Emergency" means a sudden, unexpected occurrence,
involving a clear and imminent danger, demanding immediate action to
prevent or mitigate loss of, or damage to, life, health, property, or
essential public services.
   (2) "Unexpected occurrence" includes, but is not limited to, a
fire, flood, earthquake or other soil or geologic movement, riot,
accident, damage to a subsurface installation requiring immediate
repair, or sabotage.
   (g) (1) "Excavation" means any operation in which earth, rock,
pavement, or other material below the existing grade is moved,
removed, or otherwise displaced by means of tools, equipment, or
explosives in any of the following ways: grading, trenching, digging,
ditching, drilling, augering, tunneling, scraping, cable or pipe
plowing and driving, gouging, crushing, jack hammering, saw cutting,
or any other way.
   (2) For purposes of this article, "excavation" does not include
any of the following:
   (A) Plowing, cultivating, planting, harvesting, or similar
operations in connection with agricultural activities, unless the
activity disturbs the soil to a depth of 16 inches or more.
   (B) Landscape maintenance activity that is performed with hand
tools at a depth of more than 12 inches. Landscape maintenance
activity includes all of the following:
   (i) Aeration, dethatching, and cutting of vegetation, including
lawn edging.
   (ii) Installation or replacement of ground cover and plant life.
   (iii) Minor fixes to existing drainage and sprinkler systems.
   (C) Subparagraph (B) shall become inoperative on January 1, 2020.
   (3) The exclusion of the activities in paragraph (2) from the
definition of "excavation" shall not be used to discourage a person
planning to perform those activities from voluntarily notifying a
regional notification center pursuant to Section 4216.2, and does not
relieve an operator of a subsurface installation from the obligation
to locate and field mark pursuant to Section 4216.3 following the
notification.  The exclusion of activities in paragraph (2) does
not relieve a person performing those activities from a duty of
reasonable care to prevent damage to subsurface installations. 
   (h) Except as provided in Section 4216.8, "excavator" means any
person, firm, contractor or subcontractor, owner, operator, utility,
association, corporation, partnership, business trust, public agency,
or other entity  that   that, with his, her, or
its own employees or equipment,  performs any excavation.
   (i) "Hand tool" means a piece of equipment used for excavating
that uses human power and is not powered by any motor, engine,
hydraulic, or pneumatic device.
   (j) "High priority subsurface installation" means high-pressure
natural gas pipelines with normal operating pressures greater than
415kPA gauge (60psig), petroleum pipelines, pressurized sewage
pipelines, high-voltage electric supply lines, conductors, or cables
that have a potential to ground of greater than or equal to 60kv, or
hazardous materials pipelines that are potentially hazardous to
workers or the public if damaged.
   (k) "Inactive subsurface installation" means both of the
following:
   (1) The portion of an underground subsurface installation that is
not in use but is still connected to the subsurface installation, or
to any other subsurface installation, that is in use or still carries
service.
   (2) A new underground subsurface installation that has not been
connected to any portion of an existing subsurface installation.
   (l) "Legal excavation start date and time" means at least two
working days, not including the date of notification, or up to 14
calendar days from the date of notification, if so specified by the
excavator.
   (m) "Local agency" means a city, county, city and county, school
district, or special district.
   (n) (1) "Locate and field mark" means to indicate the existence of
any owned or maintained subsurface installations by using the
guidelines in Appendix B of the "Guidelines for Operator Facility
Field Delineation" published in Best Practices Version 11.0 by the
Common Ground Alliance and in conformance with the uniform color code
of the American Public Works Association. If there is a conflict
between the marking practices in the guidelines and this article,
this article shall control.
   (2) "Locate and field mark" does not require an indication of the
depth.
   (o) "Near miss" means an event in which damage did not occur, but
a clear potential for damage was identified.
   (p) "Operator" means any person, corporation, partnership,
business trust, public agency, or other entity that owns, operates,
or maintains a subsurface installation. For purposes of Section
4216.1, an "operator" does not include an owner of real property
where subsurface  facilities  installations
 are exclusively located if they are used exclusively to furnish
services on that property and the subsurface facilities are under
the operation and control of that owner.
   (q) "Pavement" means a manmade surface material that cannot be
removed with a conventional hand tool.
   (r) "Positive response" means the response from an operator
directly to the excavator providing the status of an operator's
statutorily required response to a ticket.
   (s) "Qualified person" means a person who completes a training
program in accordance with the requirements of Section 1509 of Title
8 of the California Code of Regulations, Injury and Illness
Prevention Program, that meets the minimum locators training
guidelines and practices published in Best Practices Version 11.0 by
the Common Ground Alliance.
   (t) "Regional notification center" means a nonprofit association
or other organization of operators of subsurface installations that
provides advance warning of excavations or other work close to
existing subsurface installations, for the purpose of protecting
those installations from damage, removal, relocation, or repair.
   (u) "State agency" means every state agency, department, division,
bureau, board, or commission.
   (v) "Subsurface installation" means any underground or submerged
duct, pipeline, or structure, including, but not limited to, a
conduit, duct, line, pipe, wire, or other structure, except
nonpressurized sewerlines, nonpressurized storm drains, or other
nonpressurized drain lines.
   (w) "Ticket" means an excavation location request issued a number
by the regional notification center.
   (x) "Tolerance zone" means 24 inches on each side of the field
marking placed by the operator in one of the following ways:
   (1) Twenty-four inches from each side of a single marking, assumed
to be the centerline of the subsurface installation.
   (2) Twenty-four inches plus one-half the specified size on each
side of a single marking with the size of installation specified.
   (3) Twenty-four inches from each outside marking that graphically
shows the width of the outside surface of the subsurface installation
on a horizontal plane.
   (y) "Working day" for the purposes of determining excavation start
date and time means a weekday Monday through Friday, from 7:00 a.m.
to 5:00 p.m., except for federal holidays and state holidays, as
defined in Section 19853 of the Government Code.
   SEC. 4.   SEC. 3.   Section 4216.1 of
the Government Code is amended to read:
   4216.1.  Every operator of a subsurface installation, except the
Department of Transportation, shall become a member of, participate
in, and share in the costs of, a regional notification center.
Operators of subsurface installations who are members of, participate
in, and share in, the costs of a regional notification center,
including, but not limited to, the Underground Service
Alert--Northern California or the Underground Service Alert--Southern
California are in compliance with this section and Section 4216.9.
   SEC. 5.   SEC. 4.   Section 4216.2 of
the Government Code is amended to read:
   4216.2.  (a) Before notifying the appropriate regional
notification center, an excavator planning to conduct an excavation
shall delineate the area to be excavated. If the area is not
delineated, an operator may, at the operator's discretion, choose not
to locate and field mark until the area to be excavated has been
delineated.
   (b) Except in an emergency, an excavator planning to conduct an
excavation shall notify the appropriate regional notification center
of the excavator's intent to excavate at least two working days, and
not more than 14 calendar days, before beginning that excavation. The
date of the notification shall not count as part of the
two-working-day notice. If an excavator gives less notice than the
legal excavation start date and time and the excavation is not an
emergency, the regional notification center will take the information
and provide a ticket, but an operator has until the legal excavation
start date and time to respond.
   (c) When the excavation is proposed within 10 feet of a high
priority subsurface installation, the operator of the high priority
subsurface installation shall notify the excavator of the existence
of the high priority subsurface installation prior to the legal
excavation start date and time, and set up an onsite meeting at a
mutually agreed upon time to determine actions or activities required
to verify the location and prevent damage to the high priority
subsurface installation. The excavator shall not begin excavating
until after the completion of the onsite meeting.
   (d) Except in an emergency, every excavator covered by Section
4216.8 planning to conduct an excavation on private property that
does not require an excavation permit may contact the appropriate
regional notification center if the private property is known, or
reasonably should be known, to contain a subsurface installation
other than the underground facility owned or operated by the
excavator. Before notifying the appropriate regional notification
center, an excavator shall delineate the area to be excavated. Any
temporary marking placed at the planned excavation location shall be
clearly seen, functional, and considerate to surface aesthetics and
the local community. An excavator shall check if any local ordinances
apply to the placement of temporary markings.
   (e) If an excavator gives less than the legal excavation start
date and time and it is not an emergency, the regional notification
center shall take the information and provide a ticket but an
operator shall have until the legal excavation start date and time to
respond.
   (f) The regional notification center shall provide a ticket to the
person who contacts the center pursuant to this section and shall
notify any member, if known, who has a subsurface installation in the
area of the proposed excavation. A ticket shall be valid for 28 days
from the date of issuance. If work continues beyond 28 days, the
excavator shall update the ticket either by accessing the center's
Internet Web site or by calling "811" by the end of the 28th day.
   (g) A record of all notifications by an excavator or operator to
the regional notification center shall be maintained for a period of
not less than three years. The record shall be available for
inspection by the excavator and any member, or their representative,
during normal working hours and according to guidelines for
inspection as may be established by the regional notification
centers.
   (h) Unless an emergency exists, an excavator shall not begin
excavation until the excavator receives a positive response from all
known subsurface installations within the delineated boundaries of
the proposed area of excavation.
   (i) If a site requires special access, an excavator shall request
an operator to contact the excavator regarding that special access or
give special instructions on the location request.
   (j) If a ticket obtained by an excavator expires but work is
ongoing, the excavator shall call into the regional notification
center and get a new ticket and wait a minimum of two working days,
not including the date of call in, before restarting excavation. All
excavation shall cease during the waiting period. 
   (k) When the excavation is complete, the excavator shall eliminate
or camouflage any temporary markings that remain for 45 days or
more, unless a local ordinance indicates otherwise. 
   SEC. 6.   SEC. 5.   Section 4216.3 of
the Government Code is amended to read:
   4216.3.  (a) (1) (A)  Unless the excavator and operator mutually
agree to a later start date and time, or otherwise agree to the
sequence and timeframe in which the operator will locate and field
mark, an operator shall do one of the following before the legal
excavation start date and time:
   (i) Locate and field mark within the area delineated for
excavation and, where multiple subsurface installations of the same
type are known to exist together, mark the number of subsurface
installations.
   (ii) To the extent and degree of accuracy that the information is
available, provide information to an excavator where the operator's
active or inactive subsurface installations are located.
   (iii) Advise the excavator it operates no subsurface installations
in the area delineated for excavation.
   (B) An operator shall mark newly installed subsurface
installations in areas with continuing excavation activity.
   (C) An operator shall indicate with an "A" inside a circle the
presence of any abandoned subsurface installations within the
delineated area. The markings are to make an excavator aware that
there are abandoned subsurface installations within that delineated
work area.
   (2) Only a qualified person shall perform subsurface installation
locating activities.
   (3) A qualified person performing subsurface installation locating
activities on behalf of an operator shall use a minimum of a
single-frequency utility locating device and shall have access to
alternative sources for verification, if necessary.
   (4) An operator shall amend, update, maintain, and preserve all
plans and records for its subsurface installations as that
information becomes known. If there is a change in ownership of a
subsurface installation, the records shall be turned over to the new
operator. Records on abandoned subsurface installations, to the
extent that those records exist, shall be retained.
   (b) If the field marks are no longer reasonably visible, an
excavator shall renotify the regional notification center with a
request for remarks that can be for all or a portion of the
excavation. Excavation shall cease in the area to be remarked. If the
area to be remarked is not the full extent
                  of the original excavation, the excavator shall
delineate the portion to be remarked. If the delineation markings are
no longer reasonably visible, the excavator shall redelineate the
area to be remarked. If remarks are requested, the operator shall
have two working days, not including the date of request, to remark
the subsurface installation. Excavation shall cease in the area where
the remarks are requested. If the area to be remarked is not the
full extent of the original excavation, the excavator shall delineate
the portion to be remarked and provide a description of the area
requested to be remarked on the ticket. The excavator shall provide a
description for the area to be remarked that falls within the area
of the original location request.
   (c) Every operator may supply an electronic positive response
through the regional notification center before the legal excavation
start date and time. The regional notification center shall make
those responses available.
   (d) The excavator shall notify the appropriate regional
notification center of the failure of an operator to identify
subsurface installations pursuant to subparagraph (A) or (B) of
paragraph (1) of subdivision (a), or subdivision (b). The
notification shall include the ticket issued by the regional
notification center. A record of all notifications received pursuant
to this subdivision shall be maintained by the regional notification
center for a period of not less than three years. The record shall be
available for inspection pursuant to subdivision (h) of Section
4216.2.
   (e) If an operator or local agency knows that it has a subsurface
installation embedded or partially embedded in the pavement that is
not visible from the surface, the operator or local agency shall
contact the excavator before pavement removal to communicate and
determine a plan of action to protect that subsurface installation
and excavator.
   SEC. 7.   SEC. 6.   Section 4216.4 of
the Government Code is amended to read:
   4216.4.  (a) (1) Except as provided in paragraph (2), if an
excavation is within the approximate location of a subsurface
installation, the excavator shall  expose with hand tools to
the depth of the excavation   determine the exact
location of the subsurface installations  within the tolerance
 zone, including any applicable clearance requirements, for
the full length of the project.   zone using hand tools
before using any power-driven excavation or boring equipment within
the approximate location of the subsurface installations. In all
cases the excavator shall use reasonable care to prevent damaging
subsurface installations. 
   (2) (A) An excavator may use a vacuum excavation device to expose
subsurface installations within the tolerance zone if the operator
has marked the subsurface installation, the excavator has contacted
any operator whose subsurface installations may be in conflict with
the excavation, and the operator has agreed to the use of a vacuum
excavation device. An excavator shall inform the regional
notification center of his or her intent to use a vacuum excavation
device when obtaining a ticket.
   (B) An excavator may use power-operated or boring equipment for
the removal of any existing pavement only if there is no known
subsurface installation contained in the pavement.
   (b) If the exact location of the subsurface installation cannot be
determined by hand excavating in accordance with subdivision (a),
the excavator shall request the operator to provide additional
information to the excavator, to the extent that information is
available to the operator, to enable the excavator to determine the
exact location of the installation. If the excavator has questions
about the markings that an operator has placed, the excavator may
contact the notification center to send a request to have the
operator contact the excavator directly. The regional notification
center shall provide the excavator with the contact telephone number
of the subsurface installation operator.
   (c) An excavator discovering or causing damage to a subsurface
installation, including all breaks, leaks, nicks, dents, gouges,
grooves, or other damage to subsurface installation lines, conduits,
coatings, or cathodic protection, shall immediately notify the
subsurface installation operator. The excavator may contact the
regional notification center to obtain the contact information of the
subsurface installation operator. If high priority subsurface
installations are damaged and the operator cannot be contacted
immediately, the excavator shall call 911 emergency services.
   (d) Each excavator, operator, or locator shall communicate with
each other and respect the appropriate safety requirements and
ongoing activities of the other parties, if known, at an excavation
site.
   SEC. 8.   SEC. 7.   Section 4216.5 of
the Government Code is amended to read:
   4216.5.  The requirements of this article apply to state agencies
and to local agencies that own or operate subsurface installations,
except as otherwise provided in Section 4216.1. A local agency that
is required to provide the services described in Section 4216.3 may
charge a fee in an amount sufficient to cover the cost of providing
that service.
   SEC. 9.   SEC. 8.   Section 4216.6 of
the Government Code is amended to read:
   4216.6.  (a) (1) Any operator or excavator who negligently
violates this article is subject to a civil penalty in an amount not
to exceed ten thousand dollars ($10,000).
   (2) Any operator or excavator who knowingly and willfully violates
any of the provisions of this article is subject to a civil penalty
in an amount not to exceed fifty thousand dollars ($50,000).
   (3) Except as otherwise specifically provided in this article,
this section is not intended to affect any civil remedies otherwise
provided by law for personal injury or for property damage, including
any damage to subsurface installations, nor is this section intended
to create any new civil remedies for those injuries or that damage.
   (4) This article shall not be construed to limit any other
provision of law granting governmental immunity to state or local
agencies or to impose any liability or duty of care not otherwise
imposed by law upon any state or local agency.
   (b) An action may be brought by the Attorney General, the district
attorney, or the local or state agency that issued the permit to
excavate, for the enforcement of the civil penalty pursuant to this
section either in a civil action brought in the name of the people of
the State of California. If penalties are collected as a result of a
civil suit brought by a state or local agency for collection of
those civil penalties, the penalties imposed shall be paid to the
general fund of the agency. If more than one agency is involved in
enforcement, the penalties imposed shall be apportioned among them by
the court in a manner that will fairly offset the relative costs
incurred by the state or local agencies, or both, in collecting these
fees.
   (c) The requirements of this article may also be enforced 
following a recommendation of the California Underground Facilities
Safe Excavation Advisory Committee by a state or local agency, which
may include the Attorney General or a district attorney, with
jurisdiction over the activity or business undertaken in commission
of   the violation. The following agencies shall act to
accept, amend, or reject the recommendations of the advisory
committee  as follows:
   (1) The  registrar of the  Contractors' State License
Board shall enforce  paragraph (1) of subdivision (a) of
Section 4216.2 as specified in Section 7110.7   the
provisions of this article on contractors, as defined in Article 2 of
Chapter 9 of Division 3  of the Business and Professions Code.
   (2) The Public Utilities Commission  may enforce
subdivisions (a) and (b) of Section 4216.3 against operators of
natural gas and electric underground infrastructure, unless those
operators are municipal utilities.   shall enforce the
provisions of this article on gas corporations, as defined in Section
222 of the Public Utilities Code, and electrical corporatio 
 ns, as defined in Section 218 of the Public Utilities Code.

   (3) The Office of the State Fire Marshal  may enforce
subdivisions (a) and (b) of Section 4216.3 against operators of
hazardous liquid pipelines, unless those operators are municipal
utilities.   shall enforce the provisions of this
article on operators of hazardous liquid pipeline facilities, as
defined in Section 60101 of Chapter 601 of Subtitle VIII of Title 49
of the United States Code. 
   (d) Statewide information provided by operators and excavators
regarding facility events shall be compiled and made available in an
annual report by regional notification centers and posted on the
Internet Web sites of the regional notification centers.
   (e) For purposes of subdivision (d), the following terms have the
following meanings:
   (1) "Facility event" means the occurrence of excavator downtime,
damages, near misses, and violations.
   (2) "Statewide information" means information submitted by
operators and excavators using the California Regional Common Ground
Alliance's Virtual Private Damage Information Reporting Tool.
Supplied data shall comply with the Damage Information Reporting Tool'
s minimum essential information as listed in Best Practices Version
11.0 by the Common Ground Alliance.
   SEC. 10.   SEC. 9.   Section 4216.7 of
the Government Code is amended to read:
   4216.7.  (a) If a subsurface installation is damaged by an
excavator as a result of failing to comply with Section 4216.2 or
4216.4, or subdivision (b) of Section 4216.3, or as a result of
failing to comply with the operator's requests to protect the
subsurface installation as specified by the operator before the start
of excavation, the excavator shall be liable to the operator of the
subsurface installation for resulting damages, costs, and expenses to
the extent the damages, costs, and expenses were proximately caused
by the excavator's failure to comply.
   (b) If an operator has failed to become a member of, participate
in, or share in the costs of, a regional notification center, that
operator shall forfeit his or her claim for damages to his or her
subsurface installation arising from an excavation against an
excavator who has complied with this article to the extent damages
were proximately caused by the operator's failure to comply with this
article.
   (c) If an operator of a subsurface installation has failed to
comply with the provisions of Section 4216.3, including, but not
limited to, the requirement to field mark the appropriate location of
subsurface installations within two working days of notification,
has failed to comply with paragraph (2) of subdivision (a) of Section
4216.2, or has failed to comply with subdivision (b) of Section
4216.4, the operator shall be liable to the excavator who has
complied with Sections 4216.2 and 4216.4 for damages, including
liquidated damages, liability, losses, costs, and expenses resulting
from the operator's failure to comply with these specified
requirements to the extent the damages, costs, and expenses were
proximately caused by the operator's failure to comply.
   (d) An excavator who damages a subsurface installation due to an
inaccurate field mark by an operator, or by a third party under
contract to perform field marking for the operator, shall not be
liable for damages, replacement costs, or other expenses arising from
damages to the subsurface installation if the excavator complied
with Sections 4216.2 and 4216.4.
   This section is not intended to create any presumption or to
affect the burden of proof in any action for personal injuries or
property damage, other than damage to the subsurface installation,
nor is this section intended to affect, create, or eliminate any
remedy for personal injury or property damage, other than damage to
the subsurface installation.
   (e) In any actions for reimbursement or indemnification for a
claim arising from damage to a subsurface installation in which a
court finds that the excavator complied with the requirements of this
article, the excavator may be awarded reasonable attorney's fees and
expenses.
   (f) For the purposes of this section, "inaccurate field mark"
means a mark, or set of markings, made pursuant to Section 4216.3,
that did not correctly indicate the approximate location of a
subsurface installation affected by an excavation and includes the
actual physical location of a subsurface installation affected by an
excavation that should have been marked pursuant to Section 4216.3
but was not.
   (g) Nothing in this section shall be construed to do any of the
following:
   (1) Affect claims including, but not limited to, third-party
claims brought against the excavator or operator by other parties for
damages arising from the excavation.
   (2) Exempt the excavator or operator from his or her duty to
mitigate any damages as required by common or other applicable law.
   (3) Exempt the excavator or operator from liability to each other
or third parties based on equitable indemnity or comparative or
contributory negligence.
   SEC. 11.   SEC. 10.   Section 4216.8 of
the Government Code is amended to read:
   4216.8.  This article does not apply to either of the following
persons:
   (a) An owner of residential real property, not engaged as a
contractor or subcontractor licensed pursuant to Article 5
(commencing with Section 7065) of Chapter 9 of Division 3 of the
Business and Professions Code, who, as part of improving his or her
principal residence or an appurtenance thereto, is performing or is
having an excavation performed using hand tools that does not require
a permit issued by a state or local agency. A person described in
this subdivision is not an "excavator" as defined in subdivision (h)
of Section 4216, however this subdivision shall not discourage a
person from voluntarily notifying a regional notification center
pursuant to Section 4216.2, and does not relieve an operator of a
subsurface facility from the obligation to locate and field mark
pursuant to Section 4216.3 following the notification.  This
subdivision does not relieve a person performing excavation
activities from a duty of reasonable care to prevent damage to
subsurface installations. 
   (b) Any person or private entity that leases or rents power
operated or power-driven excavating or boring equipment, regardless
of whether an equipment operator is provided for that piece of
equipment or not, to a contractor or subcontractor licensed pursuant
to Article 5 (commencing with Section 7065) of Chapter 9 of Division
3 of the Business and Professions Code, if the signed rental
agreement between the person or private entity and the contractor or
subcontractor contains the following provision:


"It is the sole responsibility of the lessee or renter to follow the
requirements of the regional notification center law pursuant to
Article 2 (commencing with Section 4216) of Chapter 3.1 of Division 5
of Title 1 of the Government Code. By signing this contract, the
lessee or renter accepts all liabilities and responsibilities
contained in the regional notification center law."

   SEC. 12.   SEC. 11.   Section 4216.9 of
the Government Code is amended to read:
   4216.9.  (a) A permit to excavate issued by any local agency, as
defined in Section 4216, or any state agency, shall not be valid
unless the applicant has been provided an initial ticket by a
regional notification center pursuant to Section 4216.2. For purposes
of this section, "state agency" means every state agency,
department, division, bureau, board, or commission, including the
Department of Transportation.
   (b) This article does not exempt any person or corporation from
Sections 7951, 7952, and 7953 of the Public Utilities Code.
   SEC. 13.   SEC. 12.   Section 4216.10 is
added to the Government Code, to read:
   4216.10.  If the operator of a high-priority subsurface
installation finds that the depth of the subsurface installation
subject to agricultural activities described in subparagraph (A) of
paragraph (2) of subdivision (g) of Section 4216 is insufficient to
safely perform those activities, the operator of the high-priority
subsurface installation shall send notification, by registered mail,
to the landowner of the potential hazard and, within ___ days of that
notification, shall access the site at a date agreed upon by the
operator and the landowner to identify with permanent markers the
location and depth of the high-priority subsurface installation.
   SEC. 14.   SEC. 13.   Section 4216.12 is
added to the Government Code, to read:
   4216.12.  (a) The California Underground Facilities Safe
Excavation Advisory Committee is hereby created under, and shall be
assisted by the staff of, the Contractors' State License Board in the
Department of Consumer Affairs.
   (b) The advisory committee shall perform the following tasks:
   (1) Coordinate education and outreach activities that encourage
safe excavation practices, as described in Section 4216.17.
   (2) Develop standards, as described in Section 4216.18.
   (3) Investigate possible violations of this article, as described
in Section 4216.19. 
   (c) Notwithstanding any other law, the repeal of this section
renders the advisory committee subject to review by the appropriate
policy committees of the Legislature.  
   (d) This section shall remain in effect so long as, pursuant to
subdivision (c) of Section 7000.5 of the Business and Professions
Code, there is in the Department of Consumer Affairs a Contractors'
State License Board. 
   SEC. 15.   SEC. 14.   Section 4216.13 is
added to the Government Code, to read:
   4216.13.  (a) The advisory committee shall be composed of nine
members, of which  five   four  shall be
appointed by the Governor,  two   three 
shall be appointed by the Contractors' State License Board, one shall
be appointed by the Speaker of the Assembly, and one shall be
appointed by the Senate Committee on Rules.
   (b) The  five  four  members appointed
by the Governor shall be appointed, as follows:
   (1) Three members shall have knowledge and expertise in the
operation of subsurface installations. Of those three members, one
shall have knowledge and expertise in the operation of the subsurface
installations of a municipal utility.  At least one of the three
members shall have knowledge and experience in the operation of high
priority subsurface installations. 
   (2) One member shall have knowledge and expertise in subsurface
installation location and marking and shall not be under the direct
employment of an operator. 
   (3) One member shall have knowledge and expertise in operating a
regional notification center. 
   (c) The  two   three  members appointed
by the Contractors' State License Board shall have knowledge and
experience in contract excavation for employers who are not operators
of subsurface installations.  Of the three   members,
one member shall be a general engineering contractor, one member
shall be a general building contractor, and one member shall be a
specialty contractor. For the purposes of this section, the terms
"general engineering contractor," "general building contractor," and
"specialty contractor" shall have the meanings given in Article 4
(commencing with Section 7055) of Chapter 9 of Division 3 of the
Business and Professions Code. 
   (d) The member appointed by the Speaker of the Assembly shall have
knowledge and expertise in representing in safety matters the
workers employed by contract excavators.
   (e) The member appointed by the Senate Committee on Rules shall
have knowledge and expertise in managing the underground
installations on one's own property, and may be drawn from
agricultural, commercial, or residential, or other, property sectors.

   (f) The advisory committee may invite one director of operations
of a regional notification center to be a nonvoting ex officio member
of the advisory committee. 
   SEC. 16.   SEC. 15.   Section 4216.14 is
added to the Government Code, to read:
   4216.14.  (a) The term of a member of the advisory committee is
two years. Of the first members of the advisory committee, four
members, determined by lot, shall serve for one year so that the
terms of the members shall be staggered.
   (b) A member shall not be appointed for more than two consecutive
full terms.
   (c) To the extent possible, the appointing power shall fill any
vacancy in the membership of the advisory committee within 60 days
after the vacancy occurs.
   (d) Upon the recommendation of the advisory committee, the
Governor may remove a member appointed by the Governor for
incompetence or misconduct.
   (e) The advisory committee shall select a chairperson from among
its members at the first meeting of each calendar year or when a
vacancy in the chair exists.
   (f) Subject to subdivision (g), the manner in which the
chairperson is selected and the chairperson's term of office shall be
determined by the advisory committee.
   (g) A member of the advisory committee shall not serve more than
two consecutive years as the chairperson of the advisory committee.
   SEC. 17.   SEC. 16.   Section 4216.15 is
added to the Government Code, to read:
   4216.15.  The advisory committee shall meet at least once every
three months. The advisory committee shall hold meetings in
Sacramento and Los Angeles, and in other locations in the state it
deems necessary.
   SEC. 18.   SEC. 17.   Section 4216.16 is
added to the Government Code, to read:
   4216.16.  The advisory committee may obtain funding for its
operational expenses from:
   (a) The Safe Energy Infrastructure and Excavation Fund, created in
Section 320.5 of the Public Utilities Code.
   (b) A federal or state grant.
   (c) A fee charged to members of the regional notification centers
not to exceed the reasonable regulatory cost incident to enforcement
of this article.
   (d) A filing or administrative fee to hear a complaint pursuant to
Section 4216.20.
   (e) Any other source.
   SEC. 19.   SEC. 18.   Section 4216.17 is
added to the Government Code, to read:
   4216.17.  (a) In order to understand the needs for education and
outreach, and to facilitate discussion on how to coordinate those
efforts, the advisory committee shall annually convene a meeting with
state and local government agencies, California operators, regional
notification centers, and trade associations that fund outreach and
education programs that encourage safe excavation practices.
   (b) The advisory committee shall use the annual meeting described
in subdivision (a) to determine the areas in which additional
education and outreach efforts should be targeted. The advisory
committee shall grant the use of the moneys that may be apportioned
to it by the Public Utilities Commission pursuant to paragraph (1) of
subdivision (b) of Section 320.5 of the Public Utilities Code to
fund public education and outreach programs designed to promote
excavation safety around  underground facilities 
 sub   surface installations  and target towards
specific excavator groups.
   SEC. 20.   SEC. 19.   Section 4216.18 is
added to the Government Code, to read:
   4216.18.   On or before December 31, 2016, the 
 The  advisory committee shall develop a standard or set of
standards  that addresses the evidence necessary 
 relevant to safety practices in excavating around subsurface
installations and procedures and guidance in encouraging those
practices. The standard or set of standards are not intended to
replace other relevant standards, including the best practices of the
Common Ground Alliance, but are to inform areas currently  
without established standards. The standard or set of standards
shall address all of the following: 
    (a)     Evidence necessary  for
excavators and operators to demonstrate compliance with Sections
4216.2, 4216.3, and 4216.4. 
   (b) Guidance for recommended sanctions against excavators and
operators for violations of the article designed to improve safety.
Sanctions may include notification and information letters, direction
to attend relevant education, and financial penalties. The guidance
shall state the circumstances under which the investigation and a
recommendation for sanction shall be transmitted to a state or local
agency, which may include the Attorney General or a district
attorney, for enforcement pursuant to subdivision (b) of Section
4216.20 and may allow for a decision not to transmit if the
investigation was initiated by a complaint, the parties have settled
the matter, and the advisory committee has determined that further
enforcement is not necessary as a deterrent to maintain the integrity
of subsurface installations and to protect the safety of excavators
and the public. Recommendations for sanctions shall be graduated and
shall consider all of the following:  
   (1) The type of violation and its gravity.  
   (2) The degree of culpability.  
   (3) The operator's or excavator's history of violations. 

   (4) The operator's or excavator's history of work conducted
without violations.  
   (5) The efforts taken by the violator to prevent violation, and,
once the violation occurred, the efforts taken to mitigate the safety
consequences of the violation.  
   (c) What constitutes reasonable care, as required by paragraph (1)
of subdivision (a) of Section 4216.4, in conducting deep excavations
within the tolerance zone, considering the need to balance the
protection of subsurface installations by the use of hand tools
within the tolerance zone with the safety concerns of trench work.
 
   (d) What constitutes reasonable care, as required by paragraph (1)
of subdivision (a) of Section 4216.4, in grading activities on road
shoulders and dirt roads which may include standards for potholing.


 SEC. 21.   SEC. 20.   Section 4216.19 is
added to the Government Code, to read:
   4216.19.  (a) The advisory committee shall investigate possible
violations of this article, including complaints from affected
parties and members of the public.
   (b) In furthering the purposes of this article, the advisory
committee may authorize staff to use compliance audits, including
field audits, and investigations of incidents and near-misses.
   (c) This section shall become operative on January 1, 2017.
   SEC. 22.   SEC. 21.   Section 4216.20 is
added to the Government Code, to read:
   4216.20.  (a) Upon the completion of an investigation of a
possible violation of this article, the advisory committee shall
inform the following parties of the result of the investigation,
including any findings of probable violation:
   (1) The party or parties whose activities were the subject of the
investigation.
   (2) The complainant, if the investigation was initiated because of
a complaint.
   (3) Any excavator or operator whose activities or subsurface
installations were involved in the incident investigated.
   (b) If the advisory committee, upon the completion of an
investigation, finds a probable violation of the article, the
advisory committee  shall   may  transmit
the investigation results and any recommended penalty to the state or
local agency with jurisdiction over the activity or business
undertaken in commission of the violation.
   SEC. 23.   SEC. 22.   Section 4216.21 is
added to the Government Code, to read:
   4216.21.  (a) For an investigation that the advisory committee
undertakes as a result of a complaint of a violation of Sections
4216.2, 4216.3, or 4216.4, the complainant shall not file an action
in court for damages based on those violations until the
investigation is complete, or for 120 days after the investigation
begins, whichever comes first, during which time, applicable statutes
of limitation shall be tolled.
   (b) If a complainant files an action in court against a person for
damages based upon violations of Sections 4216.2, 4216.3, or 4216.4,
after the completion of an advisory committee investigation in which
the person was found not to have violated the article, the
complainant shall also notify the advisory committee when the action
is filed.
   (c) This section only applies to a claim for damages to a
subsurface installation.
   SEC. 24.   SEC. 23.   Section 4216.22 is
added to the Government Code, to read:
   4216.22.  (a) Notwithstanding Section 10231.5, the advisory
committee shall report to the Governor and the Legislature on or
before February 1, 2017, and each year thereafter, on the activities
of the advisory committee and any recommendations of the advisory
committee.
   (b) A report to be submitted pursuant to subdivision (a) shall be
submitted in compliance with Section 9795.
   SEC. 25.   SEC. 24.   Section 320.5 is
added to the Public Utilities Code, to read:
   320.5.  (a) The Safe Energy Infrastructure and Excavation Fund is
hereby established in the State Treasury. Moneys deposited into the
fund shall be used to cover the administrative expenses of the
California Underground Facilities Safe Excavation Advisory Committee,
upon appropriation by the Legislature. Additionally, the moneys may
be used as described in subdivision (b).
   (b) Up to five hundred thousand dollars ($500,000) of moneys in
the fund that are in excess of the moneys necessary for the
administrative expenses of the California Underground Facilities Safe
Excavation Advisory Committee may, upon appropriation by the
Legislature, be apportioned by the commission for the following
purposes:
   (1) The California Underground Facilities Safe Excavation Advisory
Committee, to fund public education and outreach programs designed
to promote excavation safety around  underground facilities
  subsurface installations  and targeted toward
specific excavator groups.
   (2) The commission, to further a workforce development program,
which shall be consistent with its equal employment opportunity
program, that recruits and trains safety staff to perform the highest
quality gas and electric utility inspections, audits, accident
investigations, and data tracking and analysis. Moneys used for
training purposes may not be used to fulfill existing federal or
state training requirements but, instead, shall only be used for
training in addition to those requirements. The commission may only
apportion moneys for this purpose upon commission approval of the
workforce development program at a meeting of the commission. No more
than one hundred fifty thousand dollars ($150,000) of the Safe
Energy Infrastructure and Excavation Fund may be used for this
purpose.
   (c) Any moneys not allocated pursuant to subdivisions (a) and (b)
shall be deposited into the General Fund.
   SEC. 26.   SEC. 25.   Section 971 is
added to the Public Utilities Code, to read:
   971.  (a) As a part of its damage prevention program carried out
pursuant to Section 192.614 of Part 192 of Title 49 of the Code of
Federal Regulations, each gas corporation shall collect data to
inform its outreach activities. The data shall include all of the
following:
   (1) Damages to underground commission-related pipeline facilities
that occurred during the performance of landscaping activities. Each
gas corporation shall note in its investigation of excavation damage
incidents the approximate depth of the gas facility at the time of
damage, the type of excavator involved, which may include "homeowner,"
"licensed contractor," or "unlicensed contractor," and whether the
excavator had called the regional notification center before
performing the excavation. This paragraph shall become inoperative on
January 1, 2020.
   (2) All claims filed by the gas corporation against an excavator
for damage to commission-regulated pipeline facilities.
   (3) Any other information that the commission shall require.
   (b) Each gas corporation shall annually report to the commission
excavation damage data and analyses in a format of the commission's
choosing.
   (c) No later than February 1, 2019, the commission shall report to
the Legislature an analysis of excavation damages to
commission-regulated pipeline facilities. The report shall include
analyses of the types of damages and other information described in
subdivision (a).
   SEC. 27.   SEC. 26.   Section 1702.5 of
the Public Utilities Code is amended to read:
   1702.5.  (a) The commission shall, in an existing or new
proceeding, develop and implement a safety enforcement program
applicable to gas corporations and electrical corporations that
includes procedures for monitoring, data tracking and analysis, and
investigations, as well as issuance of citations by commission staff,
under the direction of the executive director. The enforcement
program shall be designed to improve gas and electrical system safety
through the enforcement of applicable law, or order or rule of the
commission related to safety using a variety of enforcement
mechanisms, including the issuance of corrective actions, orders, and
citations by designated commission staff, and recommendations for
action made to the commission by designated commission staff.
   (1) When considering the issuance of citations and assessment of
penalties, the commission staff shall take into account voluntary
reporting of potential violations, voluntary removal or resolution
efforts undertaken, the prior history of violations, the gravity of
the violation, and the degree of culpability.
   (2) The procedures shall include, but are not limited to,
providing notice of violation within a reasonable period of time
after the discovery of the violation.
   (3) The commission shall adopt an administrative limit on the
amount of monetary penalty that may be set by commission staff.
   (b) The commission shall develop and implement an appeals process
to govern the issuance and appeal of citations or resolution of
corrective action orders issued by the commission staff. The appeals
process shall provide the respondent a reasonable period of time,
upon receiving a citation, to file a notice of appeal, shall afford
an opportunity for a hearing, and shall require the hearing officer
to expeditiously provide a draft disposition.
   (c) The commission shall, within a reasonable time set by the
commission, conclude a safety enforcement action with a finding of
violation, a corrective action order, a citation, a determination of
no violation, approval of the corrective actions undertaken by the
gas corporation or electrical corporation, or other action. The
commission may institute a formal proceeding regarding the alleged
violation, potentially resulting in additional enforcement action,
regardless of any enforcement action taken at the commission staff
level.
   (d) The commission shall implement the safety enforcement program
for gas safety by July 1, 2014, and implement the safety enforcement
program for electrical safety no later than January 1, 2015.
   (e) This section does not apply to an exempt wholesale generator,
a qualifying small power producer, or qualifying cogenerator, as
defined in Section 796 of Title 16 of the United States Code and the
regulations enacted pursuant thereto. Nothing in this section affects
the commission's authority pursuant to Section 761.3.
   (f)  Moneys   Notwithstanding any other law,
moneys  collected as a result of the issuance of citations
pursuant to this section shall be deposited in the Safe Energy
Infrastructure and Excavation Fund.
   SEC. 28.   SEC. 27.   No reimbursement
is required by this act pursuant to Section 6 of Article XIII B of
the California Constitution because the only costs that may be
incurred by a local agency or school district will be incurred
because this act creates a new crime or infraction, eliminates a
crime or infraction, or changes the penalty for a crime or
infraction, within the meaning of Section 17556 of the Government
Code, or changes the definition of a crime within the meaning of
Section 6 of Article XIII B of the California Constitution.