BILL ANALYSIS
AJR 38
Page 1
CONCURRENCE IN SENATE AMENDMENTS
AJR 38 (Caballero, Fuller and Arambula)
As Amended August 16, 2010
Majority vote
-----------------------------------------------------------------
|ASSEMBLY: |63-4 |(May 24, 2010) |SENATE: |33-1 |(August 18, |
| | | | | |2010) |
-----------------------------------------------------------------
Original Committee Reference: W., P. & W.
SUMMARY : Requests the United States Department of the Interior
(USDOI) to complete its study of the Two-Gates Fish Protection
Demonstration Project (Two-Gates Project) in the Sacramento-San
Joaquin Delta Estuary (Delta).
The Senate amendments make a minor wording change from requesting
USDOI prioritize completion of its Two-Gates Project study to
requesting USDOI complete the study as soon as possible.
EXISTING LAW :
1)Prohibits the unauthorized take of species listed as threatened
and endangered under the federal Endangered Species Act (FESA)
and California Endangered Species Act (CESA).
2)Requires the State Water Project (SWP) and federal Central
Valley Project (CVP), which operate in a coordinated fashion, to
(at certain key times) restrict the degree to which they cause
Old River and Middle River in the Delta to run backwards drawing
aquatic organisms, including threatened and endangered fish
species, into the South Delta and the SWP/CVP pumping plants.
AS PASSED BY THE ASSEMBLY , this resolution:
1)Acknowledged that from 2007 to 2009 California experienced water
management challenges due to a severe drought and, to a lesser
extent, the need to prevent the extinction of Delta fish
populations protected by FESA, CESA, or both and that drought,
recession and other hardships contributed to the economic
dislocation of rural farming communities on the west side of the
San Joaquin Valley.
2)Recognized the Two-Gates Project as an experiment that proposes
AJR 38
Page 2
to install barriers and gates across two Delta rivers with a
hypothesis that this would reduce the loss of Delta smelt at the
SWP/CVP pumps and an inference that such a reduction would allow
greater SWP/CVP export water deliveries.
3)Requested USDOI to prioritize completion of the Two-Gates
Project study.
FISCAL EFFECT : Nonfiscal
COMMENTS : This resolution was amended in the Senate to clarify
that USDOI should complete the Two-Gates Project study as soon as
possible. Completing the study is a prerequisite to determining
whether the proposed Two-Gates Project is scientifically sound.
Analysis Prepared by : Tina Cannon Leahy/Igor Lacan / W., P. & W.
/ (916) 319-2096
FN: 0006168