          Freeway construction

          DESCRIPTION:

          This bill mandates that any proposed extension of the I-710  
          freeway (see attached map) from its current terminus at the  
          boundary of the City of Los Angeles and the City of Alhambra at  
          Valley Boulevard to its connection with the I-210 in the City of  
          Pasadena be built in a tunnel.

          ANALYSIS:

          There have been proposed several surface alignments of this  
          unconstructed segment of the I-710 freeway since it was first  
          included in the state highway system in 1963. The proposed  
          alignments have engendered substantial community opposition.

           This bill  prohibits constructing the extension of the I-710  
          freeway at grade, as an elevated structure, or as a  
          cut-and-cover tunnel, effectively requiring construction of a  
          tunnel constructed by using tunnel boring technology should a  
          decision be made to close the gap. 

          COMMENTS:

           1.Purpose  . The purpose of this bill is to remove from  
            consideration previously rejected surface alignments for the  
            I-710 freeway extension in the event the Department of  
            Transportation (Caltrans) and the Los Angeles County  
            Metropolitan Transportation Authority (MTA) decide to proceed  
            with the environmental review process and preliminary  




          SB 545 (CEDILLO)                                          Page 2

                                                                       


            engineering, which are the first phase of project development.
             
          2.Background  . Over nearly fifty years, alternative concepts have  
            been proposed and evaluated to complete the I-710 freeway and  
            close the 4.5 mile gap in the corridor. To date, none of the  
            previously proposed and evaluated surface alternatives has  
            successfully addressed community concerns. These traditional  
            freeway concepts traversed through highly developed urbanized  
            neighborhoods of Los Angeles, Alhambra, South Pasadena, and  
            Pasadena, requiring such large amounts of right-of-way that  
            they were unacceptable to the communities in the corridor. In  
            response to the community objections, a tunnel concept was  
            proposed for assessment as a potential option to the surface  
            freeway alternatives. 
           3.Recent Los Angeles County sales tax includes funding for  
            project  . Last November, Los Angeles County voters approved a  
            thirty-year local transportation sales tax. AB 2321 (Feuer),  
            Chapter 302, Statutes of 2008, authorized the placement of  
            this sales tax increase before the voters. When the voters  
            approved the tax as Measure R, they also approved an  
            expenditure plan of specific projects for which the tax  
            revenue must be used. The expenditure plan identified  
            explicitly $780 million, about 21 percent of the estimated  
            project cost, for the I-710 tunnel project. The approval of  
            the sales tax placed the project into MTA's thirty-year county  
            transportation plan. 

           4.The extension is included in regional transportation plan.  The  
            Southern California Association of Governments (SCAG), the  
            federally designated metropolitan planning organization for  
            Southern California, has included the project in the regional  
            transportation plan since 1989 and in the regional  
            transportation improvement program, the multimodal  
            transportation capital outlay program for the region, since  
            1991. The project was included in the plan, according to SCAG,  
            because it relieves heavy traffic congestion on the surface  
            streets of the cities in the corridor and, in so doing,  
            contributes to the plan achieving conformity with federal and  
            state air quality standards. 

           5.Initial studies underway  . In order to have a comprehensive  
            base of geotechnical information regarding the corridor prior  
            to initiating the environmental analysis and preliminary  
            engineering, Caltrans has retained an engineering firm to  
            undertake a detailed analysis of the subsurface geology in the  
            corridor. The study will be completed in the fall of this  




          SB 545 (CEDILLO)                                          Page 3

                                                                       


            year, and after that benchmark is met, Caltrans and MTA will  
            decide whether to proceed with the environmental analysis.  
            Several issues will be examined during the environmental  
            analysis, including alternative underground alignments for the  
            tunnel, project financing, and the disposition of several  
            dozen homes, many of which are historic, that were acquired by  
            Caltrans several years ago in anticipation of constructing a  
            surface facility. 
          
          POSITIONS:  (Communicated to the Committee before noon on  
          Wednesday, 
                     April 22, 2009)

               SUPPORT:  None received. 