BILL ANALYSIS                                                                                                                                                                                                    



                                        
                       SENATE LOCAL GOVERNMENT COMMITTEE
                            Senator Dave Cox, Chair


          BILL NO:  SB 879                      HEARING:  4/19/10
          AUTHOR:  Cox                          FISCAL:  Yes
          VERSION:  4/14/10                     CONSULTANT:  Detwiler
          
                            DESIGN-BUILD CONTRACTING

                                    Background 

          The Local Agency Public Construction Act requires local  
          officials to invite bids for construction projects and then  
          award contracts to the lowest responsible bidder.  This  
          design-bid-build method is the traditional approach to  
          public works construction.  By contrast, the design-build  
          method allows local officials to procure both design and  
          construction services from a single company before the  
          development of complete plans and specifications.

          Counties can use the design-build method for projects worth  
          more than $2.5 million.  The counties' authority sunsets on  
          January 1, 2011 (SB 416, Ashburn, 2007).  Cities can use  
          the design-build method on projects worth more than $1  
          million.  The cities' design-build statute sunsets on  
          January 1, 2016 (AB 642, Wolk, 2008).

          On January 20, 2010, the Senate Local Government Committee  
          held an oversight hearing called, "Faster, Cheaper, Better?  
          How Counties Use Design-Build Contracting."  After a  
          briefing from the Legislative Analyst's Office, the  
          Committee heard from 18 speakers and received additional  
          written advice.  The Committee's staff summarized the  
          hearing's results with six staff findings:

                 Broad support exists --- especially among counties  
               --- to repeal the sunset clause and make permanent the  
               state law that allows counties to use the design-build  
               contracting method.  One labor group conditionally  
               supports an extension of the sunset clause.

                 The Legislative Analyst's recommendation to  
               eliminate the current $2.5 million price threshold  
               attracted endorsements from counties and contractors,  
               although one group affiliated with labor interests  
               disagreed.





          SB 879 -- 4/14/10 -- Page 2



                 The Legislative Analyst's recommendation to enact a  
               uniform design-build contracting statute that applies  
               to all local governments drew similar support from  
               counties and contractors, although one labor group is  
               opposed.

                 Some counties want the Legislature to allow them to  
               use design-build contracting for any capital  
               improvement projects, but labor groups are opposed.

                 No consensus exists over how to define the criteria  
               and assign weights for the best-value selection  
               procedures.  Most of the Legislature's debate over the  
               future of the counties' design-build law will need to  
               focus on controversies over these criteria and  
               weights.
                  o         While the Legislative Analyst wants  
                    legislators to place more emphasis on a project's  
                    cost, contractors disagree and argue that other  
                    criteria can be more important.
                  o         While the Legislative Analyst suggested  
                    that state law explicitly allow so-called  
                    "two-envelope" bidding, there was disagreement  
                    over its usefulness and over the usefulness of  
                    the stipulated sum method.
                  o         Some counties and labor groups disagree  
                    about retaining or eliminating consideration of  
                    life cycle costs and contractors' safety records.
                  o         There is support for a new criterion that  
                    asks prospective design-build entities about past  
                    violations of state or federal False Claims Acts.

                 Because some counties and labor groups disagree  
               about the counties' faithful observance of state laws  
               that govern the counties' use of design-build  
               contracts, legislators may wish to consider creating a  
               forum to investigate allegations.  Legislators may  
               wish to consider assigning this function to the  
               existing California Uniform Construction Cost  
               Accounting Commission which already investigates  
               allegations regarding misuse of local public works  
               contracts.


                                   Existing Law  






          SB 879 -- 4/14/10 -- Page 3



           Method  .  Local officials must follow a four-step  
          design-build method:
                 Prepare documents describing the project and its  
               specifications.
                 Prepare a detailed request for proposals, inviting  
               competitive bids.
                 Establish a detailed procedure to pre-qualify  
               design-build entities.
                 Establish the procedures to select the design-build  
               entity.

          Local officials must establish and enforce labor compliance  
          programs.  The requirement for a labor compliance program  
          doesn't apply if the local agency or the design-build  
          entity has a collective bargaining agreement.

          When pre-qualifying design-build entities, local officials  
          must collect at least 11 types of information.  The entity  
          must list its proposed mechanical subcontractors and  
          licenses.  The entity must also report past worker safety  
          violations, contracting problems, contract defaults,  
          license violations, payroll violations, and bankruptcies.   
          The entity must verify this information under oath.  State  
          law prohibits public inspection of information that is not  
          public under the Public Records Act.

           Awarding contracts  .  Local officials must select the  
          design-build entity by using either a competitive bidding  
          process in which the award goes to the lowest responsible  
          bidder, or a "best value competition" in which the local  
          officials set the criteria.  At least 50% of the weight of  
          these best value factors must include price, expertise,  
          life cycle costs, labor availability, and safety records.   
          Local officials must rank the top three responsive bidders  
          and the award goes to the responsible bidder whose proposal  
          local officials rank as "the most advantageous."  After the  
          local officials publicly announce the award, they must also  
          identify the second and third ranked bidders.

           Performance  .  The winning design-build entity must be  
          bonded and carry errors-and-omissions insurance that covers  
          its design and architectural services.  The entity must  
          adhere to local performance criteria and design standards.   
          Deviations require local officials' written consent.  Local  
          officials may hire a design professional to ensure  
          compliance.





          SB 879 -- 4/14/10 -- Page 4




          The winning design-build entity can use subcontractors who  
          were not listed in its original bid.  The entity must award  
          subcontracts by following a process set by local officials,  
          including publishing notices and setting deadlines.

          If the bid request required the design-build entity to  
          carry a performance and payment bond, the county or city  
          can retain only 5% of the contract.


                                   Proposed Law  

          Senate Bill 879 changes the design-build statutes for both  
          counties and cities.

          I.   Project limits  .  Counties can use the design-build  
          contracting method on construction projects worth more than  
          $2.5 million.  The statutory cost threshold for  
          cities'design-build projects is $1 million.  Senate Bill  
          879 lowers the cost threshold for counties' design-build  
          projects from $2.5 million to $1 million.

          II.   Evaluation factors  .  When counties and cities prepare  
          requests for proposals for design-build projects, they must  
          include at least 11 types of information.  Specifically,  
          they must include the "significant factors" which they will  
          consider when evaluating proposals, including cost or price  
          and all nonprime factors.  For both counties and cities,  
          Senate Bill 879 requires these significant factors to be  
          "objective."

          III.   False claims  .  When counties and cities prepare  
          requests for proposals for design-build projects, they must  
          include at least 11 types of information.  For its  
          oversight hearing, the Committee received written advice  
          which recommended that counties and cities ask prospective  
          design-build entities about past violations of the federal  
          or state or False Claims Acts.  Senate Bill 879 requires  
          prospective design-build entities to disclose detailed  
          information if a court found that the firm submitted (or  
          that the firm admitted to having submitted) a claim that  
          violated the federal or state False Claims Acts. 

          IV.   Subcontractor information  .  When counties and cities  
          prepare requests for proposals for design-build projects,  





          SB 879 -- 4/14/10 -- Page 5



          they must include at least 11 types of information,  
          including a listing of all partners and subcontractors.  A  
          witness at the Committee's oversight hearing said that it  
          was hard to obtain public records of subcontractors' bid  
          lists and payroll records.  Senate Bill 879 requires a  
          successful design-build entity to submit lists of  
          subcontractors, bidders, and bid awards within 14 days of  
          the contract's award.  SB 879 declares that those documents  
          are public records and available for public inspection.   
          The bill also requires the design-build entity to provide  
          the awarding party with certified payroll records with 14  
          days of a request under the Labor Code.

          V.   County reports and termination  .  When the Legislature  
          extended the design-build contracting authority to all  
          counties, it required counties to tell the Legislative  
          Analyst's Office (LAO) about their experiences by December  
          1, 2009.  The LAO had to report on these experiences by  
          January 1, 2010.  The LAO report came out in early January  
          2010.  The counties' design-build statute automatically  
          terminates ("sunsets") on January 1, 2011.  One of the  
          staff findings from the Committee's oversight hearing was  
          that broad support exists to repeal the sunset clause and  
          make the counties' design-build contracting powers  
          permanent.  Senate Bill 879 repeals the January 1, 2011  
          automatic termination date for the county's design-build  
          contracting authority.  SB 879 also repeals the requirement  
          for the LAO to report on the counties' use of the law.


                                     Comments  

          1.   Good to go  .  Fifteen years ago, the Legislature let a  
          handful of counties experiment with the design-build method  
          of contracting for public works.  Ten years ago,  
          legislators struck a compromise among local officials,  
          labor groups, and contractors to revise the design-build  
          procedures.  Five years ago, the Legislative Analyst  
          reviewed state and local design-build practices and found  
          that this contracting method could be a useful option.   
          Earlier this year, the Committee's oversight hearing  
          explored how counties use design-build contracts.  SB 879  
          reflects many of the suggestions that emerged from the  
          Committee's hearing, including the broad support for  
          repealing the counties' sunset clause, lowering the cost  
          threshold for eligible projects, making the county and city  





          SB 879 -- 4/14/10 -- Page 6



          statutes similar, and improving public disclosure of  
          important information.  Although not all labor groups and  
          construction companies like design-build contracting, the  
          custom and practice seems reasonably settled.

          2.   Too much, too soon  ?  The requirement for  
          design-bid-build contracts was a reaction to the  
          favoritism, corruption, and waste associated with major  
          public works projects in the 19th Century.  Ever since the  
          reforms that separated the design and construction phases  
          at the turn of the 20th Century, design-bid-build contracts  
          became the norm.  Responding to local officials' requests  
          for more flexibility, legislators have loosened the  
          statutes to allow experiments with design-build contracts.   
          In its last review, the LAO learned that five counties  
          completed five design-build projects in recent years, with  
          10 more projects still underway.  Some labor groups say  
          that's not enough experience to justify making the  
          counties' design-build law permanent.  Instead of repealing  
          the sunset clause, the Committee may wish to consider  
          another seven-year extension until January 1, 2018, and  
          asking for another LAO report by January 1, 2017.

          3.   Referee needed  .  At and after the Committee's oversight  
          hearing, some labor groups and county officials disagreed  
          about the counties' faithful observance of the state laws  
          that govern design-build contracts.  Other than lawsuits,  
          there is no forum to air allegations and investigate  
          grievances.  The Committee may wish to consider assigning  
          those functions to the existing California Uniform  
          Construction Cost Accounting Commission which already  
          reviews charges that local officials misuse public works  
          contracts.

          4.   Two envelopes  ?  The recent LAO report recommended that  
          state law explicitly authorize the so-called "two-envelope  
          system" of awarding design-build contracts in which  
          pre-qualified contracts submit their technical proposals in  
          one envelope and the price in a second envelope.  Local  
          officials would determine which firms had satisfactory  
          technical proposals, then open their second envelopes and  
          award the contract to the proposal that has the lowest  
          price.  Although that practice is possible under current  
          design-build laws, the statute isn't explicit nor is that  
          provision in SB 879.  The Committee may wish to consider  
          whether the Legislature should formally recognize the  





          SB 879 -- 4/14/10 -- Page 7



          two-envelope system.  
           
          5.   Two more amendments  .  Although the April 14 amendments  
          made the county and city design-build statutes more like  
          one another, the bill's author wanted to propose two other  
          changes that did not make it into those amendments:

                City selection factors  .  Counties and cities may use  
          best value and other criteria to select design-build firms.  
           A design-build competition must evaluate the proposed  
          design-build entities' proposals based on only the  
          established criteria and selection procedures.  However,  
          price, technical design, construction experience, life  
          cycle costs, skilled labor force availability, and safety  
          records must represent at least 10% of the total weight of  
          the consideration give to all criteria.  State law requires  
          cities to weigh each of these factors equally; that  
          restriction doesn't apply to counties.  SB 879 could repeal  
          the requirement that cities weigh the selection factors  
          equally.

                City reports  .  When the Legislature extended the  
          design-build contracting authority to all cities, it  
          required counties to tell the Legislative Analyst's Office  
          (LAO) about their experiences by December 1, 2014.  By  
          January 1, 2015, the LAO must report on these experiences.   
          The cities' design-build statute automatically terminates  
          ("sunsets") on January 1, 2016.  Some observers want to see  
          more detail in these reports.  When cities tell the LAO  
          about their design-build experiences, SB 879 could require  
          the cities to report the estimated and actual length of  
          time to complete projects.


                         Support and Opposition  (4/15/10)

           Support  :  American Institute of Architects-California  
          Council, California Chamber of Commerce, California Special  
          Districts Association, California State Sheriffs'  
          Association, CH2MHill, Regional Council of Rural Counties,  
          Counties of Orange and San Diego, Santa Clara Valley Water  
          District.

           Opposition  :  American Federation of State, County and  
          Municipal Employees AFL-CIO, California State Pipe Trades  
          Council, California State Association of Electrical  





          SB 879 -- 4/14/10 -- Page 8



          Workers, Professional Engineers in California Government,  
          Western States Council of Sheet Metal Workers.