BILL ANALYSIS                                                                                                                                                                                                    �



                                                                  AB 850
                                                                  Page 1

          Date of Hearing:  April 25, 2011

                       ASSEMBLY COMMITTEE ON NATURAL RESOURCES
                                Wesley Chesbro, Chair
                    AB 850 (Gordon) - As Amended:  April 14, 2011
           
          SUBJECT  :  State buildings:  efficiency

           SUMMARY  :  Revises existing energy efficiency planning 
          requirements for state facilities to give the California Energy 
          Commission (CEC) lead responsibility, instead of the Department 
          of General Services (DGS), and adds consideration of water 
          conservation.

           EXISTING LAW  :

          1)Requires DGS, in consultation with the CEC, to develop a 
            multi-year plan, to be updated biennially, with the goal of 
            exploiting all practicable and cost-effective energy 
            efficiency measures in state facilities.

          2)Authorizes the State Public Works Board to develop energy and 
            water conservation and design efficiency standards for state 
            buildings.

          3)Requires all new state buildings, as well as existing 
            buildings when renovated or remodeled, to meet energy 
            efficiency standards adopted by the CEC, and requires DGS or 
            other responsible state agencies to consider additional energy 
            efficiency measures that are cost-effective and feasible.

          4)Requires all new public buildings to be models of energy 
            efficiency - designed, constructed and equipped with all 
            energy efficiency measures, materials and devices that are 
            feasible and cost-effective.

          5)Pursuant to Executive Order S-20-04, requires the state to 
            take specified actions, including:  1) committing to 
            aggressive action to reduce state building electricity usage 
            by 20 percent by 2015, through cost-effective efficiency 
            measures and distributed generation technologies; and, 2) 
            siting, constructing, and operating all new and renovated 
            state-owned facilities as Leadership in Energy and 
            Environmental Design (LEED) Silver or higher certified 
            buildings.








                                                                  AB 850
                                                                  Page 2


           THIS BILL  :

          1)Revises the multi-year plan required under existing law to 
            give CEC lead responsibility, in consultation with DGS.

          2)Adds water conservation to the planning requirement.

          3)Prohibits the plan from prohibiting, limiting or superseding 
            more stringent green building requirements for public 
            buildings.

          4)Excludes from the plan buildings leased by the state, except 
            those financed through lease-revenue bonds.

           FISCAL EFFECT  :  Unknown

           COMMENTS  :

          Since at least 1991, state law has required new and renovated 
          state buildings to meet prevailing energy efficiency standards 
          and to consider additional measures when cost-effective and 
          feasible.  Over the same period, DGS has been required to 
          continually update an energy efficiency plan for state 
          facilities.  However, because their capital budgets are 
          disconnected from their utility budgets, state agencies often 
          have lacked the incentive and the funds to fully exploit 
          cost-effective energy efficiency opportunities in building 
          design and materials.

          According to DGS' most recent report, Recommendations and 
          Progress for Implementing Energy Efficiency Measures in State 
          Facilities, submitted to the Legislature December 3, 2010:

             Construction of new green buildings is relatively 
             straightforward, with all green building measures included in 
             the appropriated project budgets.  However, new buildings 
             represent a relatively small percentage of the potential to 
             capture significant benefits in terms of energy and 
             greenhouse gas reductions.  Retro-commissioning or 
             retrofitting existing buildings account for the majority of 
             the opportunity.

             Aside from the normal state budget process, there currently 
             is no special mechanism for funding the implementation of 








                                                                  AB 850
                                                                  Page 3

             energy efficiency measures in existing buildings, which are 
             achieved primarily through retro-commissioning and retrofit 
             projects.

          This bill would reassign primary responsibility for preparing 
          these plans from DGS to CEC and require the plans to address 
          water conservation.  

          Double referral  .  This bill is double-referred to Business, 
          Professions and Consumer Protection Committee.
           
          REGISTERED SUPPORT / OPPOSITION  :

           Support 
           
          East Bay Municipal Utility District

           Opposition 
           
          None on file

           
          Analysis Prepared by  :  Lawrence Lingbloom / NAT. RES. / (916) 
          319-2092