BILL ANALYSIS                                                                                                                                                                                                    �



                                                                  AB 2075
                                                                  Page 1

          Date of Hearing:  May 7, 2012

                       ASSEMBLY COMMITTEE ON NATURAL RESOURCES
                                Wesley Chesbro, Chair
                     AB 2075 (Fong) - As Amended:  March 29, 2012
           
          SUBJECT  :  Energy:  powerplant certification

           SUMMARY  :  Repeals Section 25502.3 of the Public Resources Code, 
          which authorizes "facilities" (i.e. thermal powerplants) 
          excluded from California Energy Commission (CEC) jurisdiction 
          when the Warren-Alquist Act was enacted in 1974 to submit to CEC 
          jurisdiction.  The CEC has proposed to rely on Section 25502.3 
          to permit photovoltaic and other non-thermal powerplants to 
          submit to its jurisdiction.

           EXISTING LAW  :

          1)Pursuant to the Warren-Alquist Act, grants the CEC exclusive 
            authority to license thermal powerplants 50 megawatts and 
            larger (including related facilities such as fuel supply 
            lines, water pipelines and transmission lines that tie the 
            plant to the grid).  The CEC must consult with specified 
            agencies, but the CEC may override any contrary state or local 
            decision.  The CEC process is a certified regulatory program 
            (determined by the Resources Secretary to be the functional 
            equivalent of CEQA), so the CEC is exempt from having to 
            prepare an environmental impact report.  Its certified 
            program, however, does require environmental analysis of the 
            project, including an analysis of alternatives and mitigation 
            measures to minimize any significant adverse effect the 
            project may have on the environment.  Judicial review of a CEC 
            power plant license decision is limited to the California 
            Supreme Court.  The Act specifically excludes photovoltaic 
            facilities of any size from CEC jurisdiction.  The Act 
            includes the following relevant definitions:

             a)   "Facility" means any electric transmission line or 
               thermal powerplant (emphasis added), or both electric 
               transmission line and thermal powerplant, regulated 
               according to the provisions of (the Act). 

             b)   "Thermal powerplant" means any stationary or floating 
               electrical generating facility using any source of thermal 
               energy, with a generating capacity of 50 megawatts or more, 








                                                                  AB 2075
                                                                  Page 2

               and any facilities appurtenant thereto..."Thermal 
               powerplant" does not include any wind, hydroelectric, or 
               solar photovoltaic electrical generating facility (emphasis 
               added).

          2)Pursuant to SB 226 (Simitian) of 2011, permits a solar thermal 
            powerplant approved by the CEC and the federal government 
            between 2007 and 2011 to petition the CEC not later than June 
            30, 2012, to review an amendment to convert the facility, in 
            whole or in part, from solar thermal technology to 
            photovoltaic technology, without the need to file an entirely 
            new application, provided that the CEC prepares supplemental 
            environmental review documentation, provides for public notice 
            and comment on the supplemental environmental review, and 
            holds at least one public hearing.






































                                                                  AB 2075
                                                                  Page 3

           FISCAL EFFECT  :  Non-fiscal

           COMMENTS  :

           1)Author's statement  :

               The CEC has issued a proposed decision in the Ridgecrest 
               project in which the Commission asserts that it actually 
               does have jurisdiction over all energy projects above 50 
               megawatts, including PV projects.

               Indeed, the CEC states in its proposed decision that 
               "�e]ven assuming that the Legislature did not initially 
               envision the Energy Commission's role in implementing 
               statewide siting policy as encompassing non-thermal 
               powerplants, the Legislature's October 2011 passage of 
               Senate Bill (SB 226) makes it plain that the Legislature 
               now has such a vision."  Further, "nothing in the language 
               in SB 226 indicates a Legislative assumption or 
               determination that the Commission would have no 
               jurisdiction over photovoltaic electrical generating 
               projects but for Section 25500.1."  

                The CEC's self-serving reinterpretation of the 
               Legislature's intent behind SB 226 and SB 226's plain 
               language runs counter to either logic or common sense as 
               the bill would have been entirely unnecessary if the CEC 
               indeed already had jurisdiction over PV projects.

               AB 2075 would repeal an outdated provision of the law that 
               allows a person proposing to construct a facility excluded 
               from the CEC's jurisdiction to waive the exclusion and 
               submit a notice of intent to file an application for 
               certification. This is the provision the Ridgecrest 
               developer relied on in the CEC hearing.  

                The original intent of this provision was to provide a 
               "grandfather" option for applications in the pipeline when 
               Public Resources Code �� 25501 and 25501.5 were adopted in 
               1974.  Since there are no longer any applications in the 38 
               year old pipeline and � 25501.5 was subsequently repealed, 
               this provision should be repealed as well, to clarify 
               jurisdictional responsibilities between the CEC and local 
               governments.  









                                                                 AB 2075
                                                                  Page 4

          2)Disproportionate response?   The controversial "Ridgecrest" 
            proposed decision cited by the author has not been adopted by 
            the CEC.  It was published and set for hearing in December 
            2011, has since been delayed several times and is currently 
            not set for hearing.  Committee staff believes that the 
            statutory interpretation in the proposed decision is incorrect 
            and observes that the weight of parties' opinions is against 
            the proposed decision.  The current status of the proposed 
            decision and whether it will ever be voted on, much less 
            adopted, by the CEC is unclear.  While repealing Section 
            25502.3 may be unnecessary as a response to Ridgecrest, the 
            section may not have any continuing value, so repealing it may 
            be appropriate as a general matter of policy.

           REGISTERED SUPPORT / OPPOSITION  :

           Support 
          
          California Farm Bureau Federation
          County of Inyo
          Defenders of Wildlife
          Kern County Board of Supervisors
          Riverside County Board of Supervisors
          Sierra Club California
          Urban Counties Caucus

           Opposition 
           
          Large-Scale Solar Association

           
          Analysis Prepared by  :  Lawrence Lingbloom / NAT. RES. / (916) 
          319-2092