BILL ANALYSIS                                                                                                                                                                                                    �



                                                                      



           ------------------------------------------------------------ 
          |SENATE RULES COMMITTEE            |                   SB 133|
          |Office of Senate Floor Analyses   |                         |
          |1020 N Street, Suite 524          |                         |
          |(916) 651-1520         Fax: (916) |                         |
          |327-4478                          |                         |
           ------------------------------------------------------------ 
           
                                         
                                    CONSENT


          Bill No:  SB 133
          Author:   Wolk (D)
          Amended:  4/5/11
          Vote:     21

           
           SENATE NATURAL RES. & WATER COMMITTEE  :  8-0, 4/12/11
          AYES:  Pavley, La Malfa, Cannella, Evans, Fuller, Kehoe, 
            Padilla, Wolk
          NO VOTE RECORDED:  Simitian

           SENATE APPROPRIATIONS COMMITTEE  :  Senate Rule 28.8


           SUBJECT  :    Natural resources:  Cache Creek Resource 
          Management Plan

           SOURCE  :     County of Yolo


           DIGEST  :    This bill extends the sunset provision for the 
          Cache Creek Resource Management Plan until December 2017, 
          and deletes the provision requiring the approval of the 
          local ordinance by the State Mining and Geology Board.

           ANALYSIS  :    The Cache Creek Resource Management Plan 
          (Plan) was initially approved by the Legislature in 1999, 
          and the sunset provision was twice extended, most recently 
          in 2007 by AB 646 (Wolk).  The current sunset date is 2012. 


          Public Resources Code Section 2715.5 states that the Plan 
          shall be considered a functional equivalent of a 
                                                           CONTINUED





                                                                SB 133
                                                                Page 
          2

          reclamation plan that would otherwise be required by the 
          California Surface Mining and Reclamation Act (SMARA).  
          That section also requires, as conditions of the statute, 
          that Yolo County approve a site specific plan and that 
          other erosion, channel stabilization, habitat, and flood 
          control measures be included in the site specific plan that 
          is approved by that county's board of supervisors.  Other 
          requirements of reclamation plans, such as an annual report 
          to the Department of Conservation, remain in effect.  
          Additionally, all surface mining operations are required to 
          obtain financial assurances as required by SMARA. 

          Yolo County succeeded in creating the Plan as a way to 
          shift commercial mining activities to off-channel mining 
          while developing an integrated approach to maintain 
          sufficient capacity in the creek to convey flood waters 
          which is supported, to a certain extent, by the private 
          firms that conduct off-stream mining.  The Plan anticipates 
          that sand and gravel would be removed from the channel of 
          the creek only to maintain and restore adequate capacity.  
          The State Mining and Geology Board approved the local 
          ordinance and deemed it consistent with state policy in 
          2009. 

          In addition to the Plan, Yolo County has obtained a series 
          of general permits from federal and state regulatory 
          agencies for purposes of meeting regulatory requirements 
          from the United States Army Corps of Engineers, the United 
          States Fish and Wildlife Service, the Central Valley 
          Regional Water Board, and the Department of Fish and Game.  
          These general permits authorize activities pursuant to the 
          Plan and avoid the need for project specific permitting. 

          This bill extends the sunset provision for the Cache Creek 
          Resource Management Plan until December 2017, and deletes 
          the provision requiring the approval of the local ordinance 
          by the State Mining and Geology Board.

           FISCAL EFFECT  :    Appropriation:  No   Fiscal Com.:  Yes   
          Local:  Yes

           SUPPORT  :   (Verified  5/2/11)

          County of Yolo (source)

                                                           CONTINUED





                                                                SB 133
                                                                Page 
          3

          Cache Creek Conservancy 
          California Construction  and Industrial Materials 
          Association
          City of Woodland
          Granite Construction Company 
          Sierra Club, Yolano Group
          Teichert Aggregates
          Tuleyome
          Water Resources Association of Yolo County 
          Yolo County Flood Control and Water Conservation District
          Yolo County Resource Conservation District

           ARGUMENTS IN SUPPORT  :    Yolo County states that the bill 
          is necessary for environmental restoration and channel 
          stabilization projects in Cache Creek and to continue to 
          implement the Plan's essential compromise which was to move 
          commercial mining off-stream. 

          The local Sierra Club group and Tuleyome, a local 
          conservation group, support the bill but encourage the 
          author to expand the bill to deal with mercury accumulation 
          from upstream sources. 


          CTW:mw  5/4/11   Senate Floor Analyses 

                         SUPPORT/OPPOSITION:  SEE ABOVE

                                ****  END  ****
          















                                                           CONTINUED