BILL ANALYSIS                                                                                                                                                                                                    �



                                                                      



           ------------------------------------------------------------ 
          |SENATE RULES COMMITTEE            |                   SB 216|
          |Office of Senate Floor Analyses   |                         |
          |1020 N Street, Suite 524          |                         |
          |(916) 651-1520         Fax: (916) |                         |
          |327-4478                          |                         |
           ------------------------------------------------------------ 
           
                                         
                              UNFINISHED BUSINESS


          Bill No:  SB 216
          Author:   Yee (D), et al.
          Amended:  8/26/11
          Vote:     21

           
           SENATE ENERGY, UTILITIES & COMM COMMITTEE  :  11-0, 04/05/11
          AYES:  Padilla, Fuller, Berryhill, Corbett, De Le�n, 
            DeSaulnier, Pavley, Rubio, Simitian, Strickland, Wright

           SENATE APPROPRIATIONS COMMITTEE  :  8-0, 05/26/11
          AYES:  Kehoe, Walters, Alquist, Lieu, Pavley, Price, 
            Runner, Steinberg
          NO VOTE RECORDED:  Emmerson

           SENATE FLOOR  :  39-0, 06/02/11
          AYES:  Alquist, Anderson, Berryhill, Blakeslee, Calderon, 
            Cannella, Corbett, Correa, De Le�n, DeSaulnier, Dutton, 
            Emmerson, Evans, Fuller, Gaines, Hancock, Harman, 
            Hernandez, Huff, Kehoe, La Malfa, Leno, Lieu, Liu, 
            Lowenthal, Negrete McLeod, Padilla, Pavley, Price, Rubio, 
            Simitian, Steinberg, Strickland, Vargas, Walters, Wolk, 
            Wright, Wyland, Yee
          NO VOTE RECORDED:  Runner

           ASSEMBLY FLOOR  :  78-0, 08/30/11 - See last page for vote


           SUBJECT  :    Public utilities:  intrastate natural gas 
          pipeline safety

           SOURCE  :     Author

                                                           CONTINUED





                                                                SB 216
                                                                Page 
          2


           DIGEST  :    This bill authorizes the California Public 
          Utilities Commission (PUC) to require automatic shut off or 
          remote controlled valves on certain natural gas facilities, 
          and unless prohibited by federal law, to require automatic 
          shut off or remote controlled valves on intrastate natural 
          gas transmission lines located in "high consequence areas" 
          or that traverse an active seismic earthquake fault line.  

           Assembly Amendments  remove the provision that designates 
          the Public Utilities Commission as the state authority 
          responsible for regulating and enforcing intrastate gas 
          pipeline transportation and pipeline facilities pursuant to 
          federal law, including the development, submission, and 
          administration of a state pipeline safety program 
          certification for natural gas pipelines.

           ANALYSIS  :    Federal law and general orders of the PUC 
          require the commission to regulate gas transmission, 
          distribution and gathering pipeline facilities which 
          include investor-owned utilities, master-metered mobile 
          home parks, storage facilities, and propane operators.

          Federal Law and general orders of the PUC set forth 
          requirements for the design, construction, testing, 
          maintenance and operation of utility gas gathering, 
          transmission and distribution piping systems.

          Federal Law and general orders of the PUC require that each 
          transmission line have sectionalized block valves placed at 
          specified intervals and in specified locations ranging from 
          every 2  miles to every 10 miles and classifies pipelines 
          based on the types of facilities that are within 220 yards 
          of its location as follows:

          Class 1:  an offshore area or location that has 10 or fewer 
                    buildings intended for human occupancy.

          Class 2:  any location that has more than 10 but fewer than 
                    46 buildings intended for human occupancy.

          Class 3:  any location that has 46 or more buildings 
                    intended for human occupancy; or an area where 
                    the pipeline lies within 100 yards of either a 

                                                           CONTINUED





                                                                SB 216
                                                                Page 
          3

                    building or a small, well-defined outside area 
                    (such as a playground, recreation area, outdoor 
                    theater, or other place of public assembly) that 
                    is occupied by 20 or more persons on at least 5 
                    days a week for 10 weeks in any 12-month period.

          Class 4:  any location where buildings with four or more 
                    stories above ground.

          Federal law defines a High Consequence Area as an area 
          including all class 3 and class 4 locations and some class 
          1 and class 2 locations with unique circumstances related 
          to surrounding populated facilities.

          This bill:
           
           1.Requires the PUC to evaluate current practices and to 
            determine whether compatible transmission safety 
            standards should be adopted for the enhancement of public 
            safety with respect to the proximity of pipelines 
            carrying liquid materials to commission-regulated gas 
            pipeline facilities, as defined, that are intrastate 
            transmission lines.

          2.Defines a commission-regulated gas pipeline facility to 
            include transmission, distribution and gathering pipeline 
            facilities which include investor-owned utilities, 
            master-metered mobile home parks, storage facilities, and 
            propane operators. 

          3.Requires each owner or operator of a commission-regulated 
            gas pipeline facility that is an intrastate transmission 
            line to provide the commission with a valve location 
            plan, along with any recommendations for valve locations. 
            The commission may make modifications to the valve 
            location plan or provide for variations from any location 
            requirements adopted by the commission pursuant to this 
            section that it deems necessary or appropriate and 
            consistent with protection of the public. 

          4.Requires the PUC to require operators of natural gas 
            transmission pipelines to install automatic or 
            remote-controlled shut off valves on natural gas 
            pipelines in areas of high population density or which 

                                                           CONTINUED





                                                                SB 216
                                                                Page 
          4

            cross active seismic faults. Pipeline operators are 
            authorized under the bill to recover the costs of these 
            upgrades from natural gas ratepayers.

          5.Requires the commission to additionally establish action 
            timelines, adopt standards for how to prioritize 
            installation of automatic shut-off or remote controlled 
            sectionalized bock vales, ensure that remote and 
            automatic shut-off valves are installed as quickly as is 
            reasonably possible, and establish ongoing procedures for 
            monitoring progress in achieving the requirements of the 
            bill.  

          6.Designates the PUC as the state authority for the 
            "811/Call Before You Dig" program established by the 
            Secretary of the Department of Transportation.

           Background

          Gas Transmission Pipeline Flow  .  The explosion created a 
          76-foot-long crater and the released natural gas ignited.  
          A 28-foot segment of the pipeline (Line 132) was shattered 
          out of the ground and blasted about 100 feet away.  Over an 
          hour passed before the valves were shut and the flow of gas 
          stopped.  The explosion occurred at 6:11 p.m.; the upstream 
          valve was closed at 7:30 p.m.; and the downstream valve was 
          closed at 7:45 p.m.  At about 7:42 p.m. flames at the 
          rupture location had diminished to the point that the 
          firefighters were able to get closer to the ruptured 
          pipeline.  Once the ruptured section was isolated and the 
          gas flow was stopped, the resulting fire from the ruptured 
          line self-extinguished.  Later that evening, PG&E isolated 
          the natural gas distribution system serving residences in 
          the area, and within a minute of stopping the gas flow at 
          about 11:30 p.m., fires from escaping natural gas at 
          damaged houses went out.

          The flows to Line 132 were controlled by manual valves 
          which are hand-operated by wheel and gear assembly or by a 
          wrench with an indicator to show whether it is open or 
          closed.   Many have questioned whether other technologies 
          such as automatic or remotely-controlled valves should be 
          in greater use so that gas flows can be interrupted more 
          quickly.  After the San Bruno explosion, PG&E was able to 

                                                           CONTINUED





                                                                SB 216
                                                                Page 
          5

          detect pressure changes in Line 132 from its control center 
          but could not stop the flow of gas from the center due to a 
          lack of remotely-controlled valves which necessitated the 
          dispatch of a crew to manually stop the gas flow.  That 
          crew was delayed due to traffic.  However the greatest 
          factor in the delay to shut down the pipes was that the 
          utility did not know the cause of the explosion.  PG&E 
          control room operators saw drops in gas pressure on the 
          transmission pipeline system and were also aware that there 
          had been an explosion in San Bruno but were unable to 
          connect the two occurrences for some time.  Reports to the 
          control room included speculation of an airplane crash or 
          gas station explosion.   
          For more information on the San Bruno tragedy, see the 
          Senate Energy, Utilities and Communications Committee 
          analysis.  
           
           Related Federal Legislation   

          There are three measures pending in Congress which also 
          call for the installation of automatic or remote valves on 
          gas transmission pipelines.

           Related State Legislation
           
          AB 56 (Hill), 2010-11 Session, implements a number of 
          public safety measures with regard to natural gas pipeline 
          facilities, including requiring the owner or operator of a 
          gas pipeline to develop a public safety program and a 
          facilities modernization program, and requiring the PUC to 
          track proposed repairs to gas facilities to determine if 
          the repairs were made.

           FISCAL EFFECT  :    Appropriation:  No   Fiscal Com.:  Yes   
          Local:  Yes

          According to the Senate Appropriations Committee:

                          Fiscal Impact (in thousands)

           Major Provisions                     2011-12     2012-13    
           2013-14          Fund
           
          Development of standards                $240       Special* 

                                                           CONTINUED





                                                                SB 216
                                                                Page 
          6


          Increased natural gas costs                       Likely in 
          the low millions over                                   
          Various
             to state agencies                                 the 
          next several years            

          * Public Utilities Commission Utilities Reimbursement 
          Account

           SUPPORT  :   (Verified  8/30/11)

          American Red Cross, California Chapters
          Board of Supervisors, San Mateo County
          California Emergency Nurses Association
          California Professional Firefighters
          California State Firefighters Association
          Consumer Attorneys of California
          San Diego Gas & Electric Company (if amended)
          San Francisco Firefighters
          San Mateo County Board of Supervisors
          San Mateo County Community College District
          San Mateo County Firefighters, IAFF Local 2400
          Sempra Energy utilities 
          Southern California Gas Company 

           ARGUMENTS IN SUPPORT  :    According to the author's office, 
          this bill has two primary goals, to establish standards to 
          separate gas transmission pipelines from water mains and to 
          require the installation of automatic or 
          remotely-controlled valves on all pipelines that cross an 
          active seismic earthquake fault or are located within a 
          High Consequence Area.


           ASSEMBLY FLOOR  :  78-0, 08/30/11
          AYES:  Achadjian, Alejo, Allen, Ammiano, Atkins, Beall, 
            Bill Berryhill, Block, Blumenfield, Bonilla, Bradford, 
            Brownley, Buchanan, Butler, Charles Calderon, Campos, 
            Carter, Cedillo, Chesbro, Conway, Cook, Davis, Dickinson, 
            Donnelly, Eng, Feuer, Fletcher, Fong, Fuentes, Furutani, 
            Beth Gaines, Galgiani, Garrick, Gatto, Gordon, Grove, 
            Hagman, Hall, Harkey, Hayashi, Roger Hern�ndez, Hill, 
            Huber, Hueso, Huffman, Jeffries, Jones, Knight, Lara, 

                                                           CONTINUED





                                                                SB 216
                                                                Page 
          7

            Logue, Bonnie Lowenthal, Ma, Mansoor, Mendoza, Miller, 
            Mitchell, Monning, Morrell, Nestande, Nielsen, Norby, 
            Olsen, Pan, Perea, V. Manuel P�rez, Portantino, Silva, 
            Skinner, Smyth, Solorio, Swanson, Torres, Valadao, 
            Wagner, Wieckowski, Williams, Yamada, John A. P�rez
          NO VOTE RECORDED:  Gorell, Halderman


          RM:rm:nl  8/30/11   Senate Floor Analyses 

                         SUPPORT/OPPOSITION:  SEE ABOVE

                                ****  END  ****