BILL ANALYSIS                                                                                                                                                                                                    �



                                                                  AB 1200
                                                                  Page  1

          CONCURRENCE IN SENATE AMENDMENTS
          AB 1200 (Levine)
          As Amended  August 27, 2013
          Majority vote
           
           ----------------------------------------------------------------- 
          |ASSEMBLY:  |72-0 |(May 24, 2013)  |SENATE: |36-0 |(September 3,  |
          |           |     |                |        |     |2013)          |
           ----------------------------------------------------------------- 
            
           Original Committee Reference:    W., P. & W.  

           SUMMARY  :  Allows the San Francisco Bay Regional Water Quality  
          Control Board (SF Regional Board) to authorize a five year pilot  
          project in Sonoma County that would study the effects, if any,  
          of allowing small agricultural irrigation ponds containing  
          recycled water to occasionally overflow during storm events into  
          adjacent areas that are already irrigated by recycled water.   
          Currently such overflows would be unauthorized waste discharges.

           The Senate amendments  :

          1)Allow, rather than require, the SF Regional Board to approve a  
            pilot project. 

          2)Specify that the pilot project must obtain a National  
            Pollutant Discharge Elimination System (NPDES) permit under  
            the federal Clean Water Act and perform all tasks needed to  
            obtain the NPDES permit including modeling, habitat  
            evaluations, and other data collection. 

          3)Require pilot project proponents to identify and secure  
            funding for project development in addition to project  
            implementation.

          4)State the SF Regional Board, upon review of the final report  
            on the pilot project, may work to develop a formula to  
            streamline approval for future comparable projects and will  
            report to the State Water Resources Control Board and the  
            Legislature with recommendations for similar policies within  
            the SF Regional Board's region or statewide.

           FISCAL EFFECT  :  According to the Senate Appropriations  
          Committee:









                                                                  AB 1200
                                                                  Page  2

          1)One-time costs up to $65,000 to the Waste Discharge Permit  
            Fund (special) for the SF Regional Board to permit the pilot  
            project and participate in the stakeholder advisory group.

          2)Ongoing cost pressures of $65,000 annually for three years to  
            the Waste Discharge Permit Fund (special) for the SF Regional  
            Board to consider the development of a formula for future  
            waste discharge permits for discharges similar to the pilot  
            project.

           COMMENTS  :  The Senate Environmental Quality Committee (Senate  
          EQ) recognized the proponents of this project were in a  
          Catch-22:  They could not get a project authorized because the  
          SF Regional Board lacked information, but there was no way to  
          gather information without an authorized project.  While Senate  
          EQ found the goal of the pilot project laudable, it did not  
          agree with requiring the SF Regional Board to conduct the  
          desired pilot project without giving the SF Regional Board the  
          discretion to determine whether the pilot project would be done  
          safely within the context of the Clean Water Act.  As a result,  
          Senate amendments were added to make the SF Regional Board's  
          approval discretionary and to make NPDES permitting and other  
          requirements explicit.

          The Senate amendments are also intended to encourage the SF  
          Regional Board to work with the Sonoma County Water Agency,  
          based on the data collected from the pilot project, to develop a  
          formula to expedite future permits that are issued for similar  
          purposes.


           Analysis Prepared by  :    Tina Cannon Leahy / W., P. & W. / (916)  
          319-2096 


                                                                FN: 0001971