Amended in Senate August 19, 2014

Amended in Senate August 11, 2014

Amended in Senate June 30, 2014

Amended in Senate June 16, 2014

Amended in Assembly May 28, 2014

Amended in Assembly April 21, 2014

California Legislature—2013–14 Regular Session

Assembly BillNo. 2581


Introduced by Assembly Member Bradford

February 21, 2014


An act to amend Sections 25402, 25402.1, and 25942 of the Public Resources Code,begin delete and to add Section 454.58 to the Public Utilities Code,end delete relating to energy.

LEGISLATIVE COUNSEL’S DIGEST

AB 2581, as amended, Bradford. Energy: appliance standards: public domain computer program: home energybegin delete rating: energy efficiency program for appliances.end deletebegin insert rating.end insert

(1) Existing law requires the State Energy Resources Conservation and Development Commission to prescribe, by regulation, standards for minimum levels of operating efficiency, and authorizes the commission to prescribe other cost-effective measures, to promote the use of energy-efficient and water-efficient appliances whose use requires a significant amount of energy or water on a statewide basis.

This bill would instead authorize the commission to prescribe or adopt other cost-effective measures. The bill would authorize the commission to consider or recognize voluntary agreements in lieu of regulation described above and to take voluntary agreements into account in its planning. The bill would require the commission to consider adopting a process for the repeal, or suspension of enforcement, of a standard for minimum levels of operating efficiency for an appliance that the commission finds to be duplicative or inconsistent with federal or state law. The bill would require any labeling requirement prescribed by the commission to allow a manufacturer to use electronic labeling as appropriate. The bill would require the commission to consider the most current data provided to the commission regarding a proposed standard for an appliance before the publication of the notice of the proposed action to consider adoption or amendment of a standard for an appliance. The bill would require the commission to explain in the final statement of reasons how it considered those data.

(2) Existing law requires the commission to prescribe, by regulation, lighting, insulation climate control system, and other building design and construction standards that increase the efficiency in the use of energy and water for new residential and new nonresidential buildings. Existing law also requires the commission to prescribe, by regulation, energy and water conservation design standards for new residential and new nonresidential buildings. In order to implement these requirements, existing law requires the commission to develop a public domain computer program that enables contractors, builders, architects, engineers, and government officials to estimate energy consumed by residential and nonresidential buildings and requires the commission to establish a formal process for certification of compliance options for new products, materials, and calculation methods, as prescribed.

This bill would require the commission to approve and make publicly available, not less than 6 months prior to the effective date of adopted or updated efficiency standards, the public domain computer program. The bill would require the commission, before approving the public domain computer program, to perform preliminary tests of the public domain computer program using common examples of residential and nonresidential buildings and building systems to ensure the usability of the program by users of the program. The bill would require the commission to make the results of those preliminary tests publicly available.

(3) Existing law requires the commission to establish criteria for adopting a statewide home energy rating program for residential dwellings.

For existing single-family residential dwellings and multifamily residential dwellings with up to 4 units, the bill would require the commission, in administering the statewide home energy rating program, to ensure that energy assessment tools used by the commission are routinely adjusted to improve modeling accuracy and to ensure that consumers receive a notice with the output of the energy assessment tools explaining the assumptions used in the energy assessment tools and how they may differ from actual usage patterns.

begin delete

(4) Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations, as defined. The Public Utilities Act requires the commission to review and accept, modify, or reject a procurement plan for each electrical corporation in accordance with specified elements, incentive mechanisms, and objectives. The act requires that an electrical corporation’s proposed procurement plan include certain elements, including a showing that the electrical corporation will first meet its unmet needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.

end delete
begin delete

This bill would require the Public Utilities Commission, no later than January 1, 2016, to include in its energy efficiency portfolio program, a program to provide incentives to an electrical corporation that adopts an energy efficiency program to reduce electrical demand from indoor appliances. In order to receive incentives from the program, the bill would require the commission to require an energy efficiency program for indoor appliances adopted by an electrical corporation to be established and maintained at a net to gross ratio of 0.8 for 36 consecutive months. After 36 months, the bill would authorize the commission to evaluate the energy efficiency program and adjust the net to gross ratio on a prospective basis.

end delete

Vote: majority. Appropriation: no. Fiscal committee: yes. State-mandated local program: no.

The people of the State of California do enact as follows:

P3    1

SECTION 1.  

Section 25402 of the Public Resources Code is
2amended to read:

3

25402.  

The commission shall, after one or more public
4hearings, do all of the following, in order to reduce the wasteful,
5uneconomic, inefficient, or unnecessary consumption of energy,
6including the energy associated with the use of water:

P4    1(a) (1) Prescribe, by regulation, lighting, insulation climate
2control system, and other building design and construction
3standards that increase the efficiency in the use of energy and water
4for new residential and new nonresidential buildings. The
5commission shall periodically update the standards and adopt any
6revision that, in its judgment, it deems necessary. Six months after
7the commission certifies an energy conservation manual pursuant
8to subdivision (c) of Section 25402.1, a city, county, city and
9county, or state agency shall not issue a permit for a building unless
10the building satisfies the standards prescribed by the commission
11pursuant to this subdivision or subdivision (b) that are in effect on
12the date an application for a building permit is filed. Water
13efficiency standards adopted pursuant to this subdivision shall be
14demonstrated by the commission to be necessary to save energy.

15(2) Prior to adopting a water efficiency standard for residential
16buildings, the Department of Housing and Community
17Development and the commission shall issue a joint finding
18whether the standard (A) is equivalent or superior in performance,
19safety, and for the protection of life, health, and general welfare
20to standards in Title 24 of the California Code of Regulations and
21(B) does not unreasonably or unnecessarily impact the ability of
22Californians to purchase or rent affordable housing, as determined
23by taking account of the overall benefit derived from water
24efficiency standards. This subdivision does not in any way reduce
25the authority of the Department of Housing and Community
26Development to adopt standards and regulations pursuant to Part
271.5 (commencing with Section 17910) of Division 13 of the Health
28and Safety Code.

29(3) Water efficiency standards and water conservation design
30standards adopted pursuant to this subdivision and subdivision (b)
31shall be consistent with the legislative findings of this division to
32ensure and maintain a reliable supply of electrical energy and be
33equivalent to or superior to the performance, safety, and protection
34of life, health, and general welfare standards contained in Title 24
35of the California Code of Regulations. The commission shall
36consult with the members of the coordinating council as established
37in Section 18926 of the Health and Safety Code in the development
38of these standards.

39(b) (1) Prescribe, by regulation, energy and water conservation
40design standards for new residential and new nonresidential
P5    1buildings. The standards shall be performance standards and shall
2be promulgated in terms of energy consumption per gross square
3foot of floorspace, but may also include devices, systems, and
4techniques required to conserve energy and water. The commission
5shall periodically review the standards and adopt any revision that,
6in its judgment, it deems necessary. A building that satisfies the
7standards prescribed pursuant to this subdivision need not comply
8with the standards prescribed pursuant to subdivision (a). Water
9conservation design standards adopted pursuant to this subdivision
10shall be demonstrated by the commission to be necessary to save
11energy. Prior to adopting a water conservation design standard for
12residential buildings, the Department of Housing and Community
13Development and the commission shall issue a joint finding
14whether the standard (A) is equivalent or superior in performance,
15safety, and for the protection of life, health, and general welfare
16to standards in the California Building Standards Code and (B)
17does not unreasonably or unnecessarily impact the ability of
18Californians to purchase or rent affordable housing, as determined
19by taking account of the overall benefit derived from the water
20conservation design standards. Nothing in this subdivision in any
21way reduces the authority of the Department of Housing and
22Community Development to adopt standards and regulations
23pursuant to Part 1.5 (commencing with Section 17910) of Division
2413 of the Health and Safety Code.

25(2) In order to increase public participation and improve the
26efficacy of the standards adopted pursuant to subdivisions (a) and
27(b), the commission shall, prior to publication of the notice of
28proposed action required by Section 18935 of the Health and Safety
29Code, involve parties who would be subject to the proposed
30regulations in public meetings regarding the proposed regulations.
31All potential affected parties shall be provided advance notice of
32these meetings and given an opportunity to provide written or oral
33comments. During these public meetings, the commission shall
34receive and take into consideration input from all parties
35concerning the parties’ design recommendations, cost
36considerations, and other factors that would affect consumers and
37California businesses of the proposed standard. The commission
38shall take into consideration prior to the start of the notice of
39proposed action any input provided during these public meetings.

P6    1(3) The standards adopted or revised pursuant to subdivisions
2(a) and (b) shall be cost-effective when taken in their entirety and
3when amortized over the economic life of the structure compared
4with historic practice. When determining cost-effectiveness, the
5commission shall consider the value of the water or energy saved,
6impact on product efficacy for the consumer, and the life-cycle
7cost of complying with the standard. The commission shall consider
8other relevant factors, as required by Sections 18930 and 18935
9of the Health and Safety Code, including, but not limited to, the
10impact on housing costs, the total statewide costs and benefits of
11the standard over its lifetime, economic impact on California
12businesses, and alternative approaches and their associated costs.

13(c) (1) (A) Prescribe, by regulation, standards for minimum
14levels of operating efficiency, based on a reasonable use pattern,
15and may prescribe or adopt other cost-effective measures, including
16incentive programs, fleet averaging, energy and water consumption
17labeling not preempted by federal labeling law, and consumer
18education programs, to promote the use of energy and water
19efficient appliances whose use, as determined by the commission,
20requires a significant amount of energy or water on a statewide
21basis. The minimum levels of operating efficiency shall be based
22on feasible and attainable efficiencies or feasible improved
23efficiencies that will reduce the energy or water consumption
24growth rates. The standards shall become effective no sooner than
25one year after the date of adoption or revision. A new appliance
26manufactured on or after the effective date of the standards shall
27not be sold or offered for sale in the state, unless it is certified by
28the manufacturer thereof to be in compliance with the standards.
29The standards shall be drawn so that they do not result in any added
30total costs for consumers over the designed life of the appliances
31concerned.

32(B) In order to increase public participation and improve the
33efficacy of the standards adopted pursuant to this subdivision, the
34commission shall, prior to publication of the notice of proposed
35action required by Section 18935 of the Health and Safety Code,
36involve parties who would be subject to the proposed regulations
37in public meetings regarding the proposed regulations. All potential
38affected parties shall be provided advance notice of these meetings
39and given an opportunity to provide written or oral comments.
40During these public meetings, the commission shall receive and
P7    1take into consideration input from all parties concerning the parties’
2design recommendations, cost considerations, and other factors
3that would affect consumers and California businesses of the
4proposed standard. The commission shall take into consideration
5prior to the start of the notice of proposed action any input provided
6during these public meetings.

7(C) The standards adopted or revised pursuant to this subdivision
8shall not result in any added total costs for consumers over the
9designed life of the appliances concerned. When determining
10cost-effectiveness, the commission shall consider the value of the
11water or energy saved, impact on product efficacy for the
12consumer, and the life-cycle cost to the consumer of complying
13with the standard. The commission shall consider other relevant
14factors, as required by Sections 11346.5 and 11357 of the
15Government Code, including, but not limited to, the impact on
16housing costs, the total statewide costs and benefits of the standard
17over its lifetime, economic impact on California businesses, and
18alternative approaches and their associated costs.

19(D) Any labeling requirement prescribed by the commission
20pursuant to subparagraph (A) shall allow a manufacturer to use
21electronic labeling as appropriate. The use of electronic labeling
22does not alter requirements to submit data to the commission’s
23appliance efficiency database.

24(2) A new appliance, except for any plumbing fitting, regulated
25under paragraph (1), that is manufactured on or after July 1, 1984,
26shall not be sold, or offered for sale, in the state, unless the date
27of the manufacture is permanently displayed in an accessible place
28on that appliance.

29(3) During the period of five years after the commission has
30adopted a standard for a particular appliance under paragraph (1),
31an increase or decrease in the minimum level of operating
32efficiency required by the standard for that appliance shall not
33become effective, unless the commission adopts other cost-effective
34measures for that appliance.

35(4) Neither the commission nor any other state agency shall
36take any action to decrease any standard adopted under this
37subdivision on or before June 30, 1985, prescribing minimum
38levels of operating efficiency or other energy conservation
39measures for any appliance, unless the commission finds by a
40four-fifths vote that a decrease is of benefit to ratepayers, and that
P8    1there is significant evidence of changed circumstances. Before
2January 1, 1986, the commission shall not take any action to
3increase a standard prescribing minimum levels of operating
4efficiency for any appliance or adopt a new standard under
5paragraph (1). Before January 1, 1986, any appliance manufacturer
6doing business in this state shall provide directly, or through an
7appropriate trade or industry association, information, as specified
8by the commission after consultation with manufacturers doing
9business in the state and appropriate trade or industry associations
10on sales of appliances so that the commission may study the effects
11of regulations on those sales. These informational requirements
12shall remain in effect until the information is received. The trade
13or industry association may submit sales information in an
14aggregated form in a manner that allows the commission to carry
15out the purposes of the study. The commission shall treat any sales
16 information of an individual manufacturer as confidential and that
17information shall not be a public record. The commission shall not
18request any information that cannot be reasonably produced in the
19exercise of due diligence by the manufacturer. At least one year
20prior to the adoption or amendment of a standard for an appliance,
21the commission shall notify the Legislature of its intent, and the
22justification to adopt or amend a standard for the appliance. The
23commission shall consider the most current data provided to the
24commission regarding any proposed standard under this subdivision
25before the publication of the notice of proposed action pursuant
26to paragraph (5) of subdivision (a) of Section 11346.4 of the
27Government Code to consider adoption or amendment of a standard
28for an appliance pursuant to this subdivision. The commission
29shall explain in the final statement of reasons prepared pursuant
30to Section 11346.9 of the Government Code how it considered
31this data provided to the commission. Notwithstanding paragraph
32(3) and this paragraph, the commission may do any of the
33following:

34(A) Increase the minimum level of operating efficiency in an
35existing standard up to the level of the National Voluntary
36Consensus Standards 90, adopted by the American Society of
37Heating, Refrigeration, and Air Conditioning Engineers or, for
38appliances not covered by that standard, up to the level established
39in a similar nationwide consensus standard.

P9    1(B) Change the measure or rating of efficiency of any standard,
2if the minimum level of operating efficiency remains substantially
3the same.

4(C) Adjust the minimum level of operating efficiency in an
5existing standard in order to reflect changes in test procedures that
6the standards require manufacturers to use in certifying compliance,
7if the minimum level of operating efficiency remains substantially
8the same.

9(D) Readopt a standard preempted, enjoined, or otherwise found
10legally defective by an administrative agency or a lower court, if
11final legal action determines that the standard is valid and if the
12standard that is readopted is not more stringent than the standard
13that was found to be defective or preempted.

14(E) Adopt or amend any existing or new standard at any level
15of operating efficiency, if the Governor has declared an energy
16emergency as described in Section 8558 of the Government Code.

17(5) Notwithstanding paragraph (4), the commission may adopt
18standards pursuant to Commission Order No. 84-0111-1, on or
19before June 30, 1985.

20(6) (A) The commission may consider or recognize voluntary
21 agreements in lieu of regulation pursuant to paragraph (1).

22(B) The commission may take voluntary agreements into account
23in its planning.

24(7) The commission shall consider, as part of the rulemaking
25proceeding instituted by Commission Order No. 12-0112-06,
26adopting a process for the repeal, or suspension of enforcement,
27of a standard prescribed by paragraph (1) that the commission
28finds is duplicative or inconsistent with federal or state law.

29(d) (1) Recommend minimum standards of efficiency for the
30operation of a new facility at a particular site that are technically
31and economically feasible. A site and related facility shall not be
32certified pursuant to Chapter 6 (commencing with Section 25500),
33unless the applicant certifies that standards recommended by the
34commission have been considered, which certification shall include
35a statement specifying the extent to which conformance with the
36recommended standards will be achieved.

37(2) Whenever this section and Chapter 11.5 (commencing with
38Section 19878) of Part 3 of Division 13 of the Health and Safety
39Code are in conflict, the commission shall be governed by that
40chapter of the Health and Safety Code to the extent of the conflict.

P10   1(e) The commission shall do all of the following:

2(1) Not later than January 1, 2004, amend any regulations in
3effect on January 1, 2003, pertaining to the energy efficiency
4standards for residential clothes washers to require that residential
5clothes washers manufactured on or after January 1, 2007, be at
6least as water efficient as commercial clothes washers.

7(2) Not later than April 1, 2004, petition the federal Department
8of Energy for an exemption from any relevant federal regulations
9governing energy efficiency standards that are applicable to
10residential clothes washers.

11(3) Not later than January 1, 2005, report to the Legislature on
12its progress with respect to the requirements of paragraphs (1) and
13(2).

14

SEC. 2.  

Section 25402.1 of the Public Resources Code is
15amended to read:

16

25402.1.  

In order to implement the requirements of subdivisions
17(a) and (b) of Section 25402, all of the following shall apply:

18(a) The commission shall develop a public domain computer
19program that will enable contractors, builders, architects, engineers,
20and government officials to estimate the energy consumed by
21residential and nonresidential buildings. The commission may
22charge a fee for the use of the program, which shall be based upon
23the actual cost of the program, including any computer costs.

24(b) The commission shall establish a formal process for
25certification of compliance options for new products, materials,
26and calculation methods that provides for adequate technical and
27public review to ensure accurate, equitable, and timely evaluation
28of certification applications. Proponents filing applications for new
29products, materials, and calculation methods shall provide all
30information needed to evaluate the application that is required by
31the commission. The commission shall publish annually the results
32of its certification decisions and instructions to users and local
33building officials concerning requirements for showing compliance
34with the building standards for new products, materials, or
35calculation methods. The commission may charge and collect a
36reasonable fee from applicants to cover the costs under this
37subdivision. Any funds received by the commission for purposes
38of this subdivision shall be deposited in the Energy Resources
39Programs Account and, notwithstanding Section 13340 of the
40Government Code, are continuously appropriated to the
P11   1commission for the purposes of this subdivision. Any
2unencumbered portion of funds collected as a fee for an application
3remaining in the Energy Resources Programs Account after
4completion of the certification process for that application shall
5be returned to the applicant within a reasonable period of time.

6(c) The commission shall include a prescriptive method of
7complying with the standards, including design aids such as a
8manual, sample calculations, and model structural designs.

9(d) The commission shall conduct a pilot project of field testing
10of actual residential buildings to calibrate and identify potential
11needed changes in the modeling assumptions to increase the
12accuracy of the public domain computer program specified in
13subdivision (a) and to evaluate the impacts of the standards,
14including, but not limited to, the energy savings, cost-effectiveness,
15and the effects on indoor air quality. The pilot project shall be
16conducted pursuant to a contract entered into by the commission.
17The commission shall consult with the participants designated
18pursuant to Section 9202 of the Public Utilities Code, as that
19section read on December 31, 2003, to seek funding and support
20for field monitoring in each public utility service territory, with
21the University of California to take advantage of its extensive
22building monitoring expertise, and with the California Building
23Industry Association to coordinate the involvement of builders
24and developers throughout the state. The pilot project shall include
25periodic public workshops to develop plans and review progress.
26The commission shall prepare and submit a report to the Legislature
27on progress and initial findings not later than December 31, 1988,
28and a final report on the results of the pilot project on residential
29buildings not later than June 30, 1990. The report shall include
30recommendations regarding the need and feasibility of conducting
31further monitoring of actual residential and nonresidential
32buildings. The report shall also identify any revisions to the public
33 domain computer program and energy conservation standards if
34the pilot project determines that revisions are appropriate.

35(e) The commission shall certify, not later than 180 days after
36approval of the standards by the State Building Standards
37Commission, an energy conservation manual for use by designers,
38builders, and contractors of residential and nonresidential buildings.
39The manual shall be furnished upon request at a price sufficient
40to cover the costs of production and shall be distributed at no cost
P12   1to all affected local agencies. The manual shall contain, but not be
2limited to, the following:

3(1) The standards for energy conservation established by the
4commission.

5(2) Forms, charts, tables, and other data to assist designers and
6builders in meeting the standards.

7(3) Design suggestions for meeting or exceeding the standards.

8(4) Any other information which the commission finds will
9assist persons in conforming to the standards.

10(5) Instructions for use of the computer program for calculating
11energy consumption in residential and nonresidential buildings.

12(6) The prescriptive method for use as an alternative to the
13computer program.

14(f) The commission shall approve and make publicly available,
15not less than six months prior to the effective date of adopted or
16updated standards, the public domain computer program developed
17pursuant to subdivision (a). Before approving the public domain
18computer program, the commission shall do both of the following:

19(1) Perform preliminary tests of the public domain computer
20program using common examples of residential and nonresidential
21buildings and building systems to ensure the usability of the public
22domain computer program by users of the program, including, but
23not limited to, architects, builders, contractors, and local code
24enforcement personnel.

25(2) Make the results of the preliminary tests publicly available.

26(g) The commission shall establish a continuing program of
27technical assistance to local building departments in the
28enforcement of subdivisions (a) and (b) of Section 25402 and this
29section. The program shall include the training of local officials
30in building technology and enforcement procedures related to
31energy conservation, and the development of complementary
32training programs conducted by local governments, educational
33institutions, and other public or private entities. The technical
34assistance program shall include the preparation and publication
35of forms and procedures for local building departments in
36performing the review of building plans and specifications. The
37commission shall provide, on a contract basis, a review of building
38plans and specifications submitted by a local building department,
39and shall adopt a schedule of fees sufficient to repay the cost of
40those services.

P13   1(h) Subdivisions (a) and (b) of Section 25402 and this section,
2and the rules and regulations of the commission adopted pursuant
3to those provisions, shall be enforced by the building department
4of every city, county, or city and county.

5(1) A building permit for a residential or nonresidential building
6shall not be issued by a local building department, unless a review
7by the building department of the plans for the proposed residential
8or nonresidential building contains detailed energy system
9specifications and confirms that the building satisfies the minimum
10standards established pursuant to subdivision (a) or (b) of Section
1125402 and this section applicable to the building.

12(2) Where there is no local building department, the commission
13shall enforce subdivisions (a) and (b) of Section 25402 and this
14section.

15(3) If a local building department fails to enforce subdivisions
16(a) and (b) of Section 25402 and this section or any other provision
17of this chapter or standard adopted pursuant thereto, the
18commission may provide enforcement after furnishing 10 days’
19written notice to the local building department.

20(4) A city, county, or city and county may, by ordinance or
21resolution, prescribe a schedule of fees sufficient to pay the costs
22incurred in the enforcement of subdivisions (a) and (b) of Section
2325402 and this section. The commission may establish a schedule
24of fees sufficient to pay the costs incurred by that enforcement.

25(5) The construction of a state building shall not commence
26until the Department of General Services or the state agency that
27otherwise has jurisdiction over the property reviews the plans for
28the proposed building and certifies that the plans satisfy the
29minimum standards established pursuant to Chapter 2.8
30(commencing with Section 15814.30) of Part 10b of Division 3 of
31Title 2 of the Government Code, subdivision (a) or (b) of Section
3225402, and this section that are applicable to the building.

33(i) Subdivisions (a) and (b) of Section 25402 and this section
34shall apply only to new residential and nonresidential buildings
35on which actual site preparation and construction have not
36commenced prior to the effective date of rules and regulations
37adopted pursuant to those sections that are applicable to those
38buildings. Those sections shall not prohibit either of the following:

39(1) The enforcement of state or local energy conservation or
40energy insulation standards, adopted prior to the effective date of
P14   1rules and regulations adopted pursuant to subdivisions (a) and (b)
2of Section 25402 and this section with regard to residential and
3nonresidential buildings on which actual site preparation and
4construction have commenced prior to that date.

5(2) The enforcement of city or county energy conservation or
6energy insulation standards, whenever adopted, with regard to
7residential and nonresidential buildings on which actual site
8preparation and construction have not commenced prior to the
9effective date of rules and regulations adopted pursuant to
10subdivisions (a) and (b) of Section 25402 and this section, if the
11city or county files the basis of its determination that the standards
12are cost effective with the commission and the commission finds
13that the standards will require the diminution of energy
14consumption levels permitted by the rules and regulations adopted
15pursuant to those sections. If, after two or more years after the
16filing with the commission of the determination that those standards
17are cost effective, there has been a substantial change in the factual
18circumstances affecting the determination, upon application by
19any interested party, the city or county shall update and file a new
20basis of its determination that the standards are cost effective. The
21determination that the standards are cost effective shall be adopted
22by the governing body of the city or county at a public meeting.
23If, at the meeting on the matter, the governing body determines
24that the standards are no longer cost effective, the standards shall,
25as of that date, be unenforceable and no building permit or other
26entitlement shall be denied based on the noncompliance with the
27standards.

28(j) The commission may exempt from the requirements of this
29section and of any regulations adopted pursuant to this section any
30proposed building for which compliance would be impossible
31without substantial delays and increases in cost of construction, if
32the commission finds that substantial funds have been expended
33in good faith on planning, designing, architecture, or engineering
34prior to the date of adoption of the regulations.

35(k) If a dispute arises between an applicant for a building permit,
36or the state pursuant to paragraph (5) of subdivision (h), and the
37building department regarding interpretation of Section 25402 or
38the regulations adopted pursuant thereto, either party may submit
39the dispute to the commission for resolution. The commission’s
40 determination of the matter shall be binding on the parties.

P15   1(l) Nothing in Section 25130, 25131, or 25402, or in this section
2prevents enforcement of any regulation adopted pursuant to this
3chapter, or Chapter 11.5 (commencing with Section 19878) of Part
43 of Division 13 of the Health and Safety Code as they existed
5prior to September 16, 1977.

6

SEC. 3.  

Section 25942 of the Public Resources Code is
7amended to read:

8

25942.  

(a) On or before July 1, 1995, the commission shall
9establish criteria for adopting a statewide home energy rating
10program for residential dwellings. The program criteria shall
11include, but are not limited to, all of the following elements:

12(1) Consistent, accurate, and uniform ratings based on a single
13statewide rating scale.

14(2) Reasonable estimates of potential utility bill savings, and
15reliable recommendations on cost-effective measures to improve
16energy efficiency.

17(3) Training and certification procedures for home raters and
18quality assurance procedures to promote accurate ratings and to
19 protect consumers.

20(4) In coordination with home energy rating service organization
21databases, procedures to establish a centralized, publicly accessible,
22database that includes a uniform reporting system for information
23on residential dwellings, excluding proprietary information, needed
24to facilitate the program. There shall be no public access to
25information in the database concerning specific dwellings without
26the owner’s or occupant’s permission.

27(5) Labeling procedures that will meet the needs of home buyers,
28homeowners, renters, the real estate industry, and mortgage lenders
29with an interest in home energy ratings.

30(b) The commission shall adopt the program pursuant to
31subdivision (a) in consultation with representatives of the Bureau
32of Real Estate, the Department of Housing and Community
33Development, the Public Utilities Commission, investor-owned
34and municipal utilities, cities and counties, real estate licensees,
35home builders, mortgage lenders, home appraisers and inspectors,
36home energy rating organizations, contractors who provide home
37energy services, consumer groups, and environmental groups.

38(c) On and after January 1, 1996, a home energy rating services
39shall not be performed in this state unless the services have been
40certified, if such a certification program is available, by the
P16   1commission to be in compliance with the program criteria specified
2in subdivision (a) and, in addition, are in conformity with any other
3applicable element of the program.

4(d) On or before July 1, 1996, the commission shall consult with
5the agencies and organizations described in subdivision (b), to
6facilitate a public information program to inform homeowners,
7rental property owners, renters, sellers, and others of the existence
8of the statewide home energy rating program adopted by the
9commission.

10(e) The commission shall, as part of the biennial report prepared
11pursuant to Section 25302, report on the progress made to
12implement a statewide home energy rating program. The report
13shall include an evaluation of the energy savings attributable to
14the program, and a recommendation concerning which means and
15methods will be most efficient and cost-effective to induce home
16energy ratings for residential dwellings.

17(f) For existing single-family residential dwellings and
18multifamily residential dwellings with up to four units, the
19commission shall do both of the following in administering the
20statewide home energy rating program:

21(1) Ensure energy assessment tools used by the commission are
22routinely adjusted to improve modeling accuracy.

23(2) Ensure that consumers receive a notice with the output of
24the energy assessment tools explaining the assumptions used in
25the energy assessment tools and how they may differ from actual
26usage patterns.

begin delete
27

SEC. 4.  

Section 454.58 is added to the Public Utilities Code,
28to read:

29

454.58.  

(a) No later than January 1, 2016, the commission
30shall, in a new or existing proceeding, include a program in its
31energy efficiency portfolio program to provide incentives to an
32electrical corporation that adopts an energy efficiency program to
33reduce electrical demand from indoor appliances.

34(b) The program established by the commission pursuant to
35subdivision (a) shall address challenges and minimize
36programmatic barriers that may limit or inhibit the achievement
37of energy efficiency goals determined by the commission. The
38energy efficiency goals shall include, but not be limited to, all of
39the following:

40(1) Evaluation and attribution of energy savings.

P17   1(2) Long-lasting, sustainable increases in the adoption of energy
2efficiency technologies through structural changes in the market
3and in behaviors of market actors for indoor appliances that receive
4electricity through power outlets, such as 110 voltage alternating
5current (VAC), and other emerging delivery mechanisms, including
6universal serial bus (USB), Power over Ethernet (PoE), and 24-volt
7direct current (VDC).

8(c) In order to receive incentives from the program, the
9commission shall require an energy efficiency program adopted
10by an electrical corporation pursuant to subdivision (a) to be
11established and maintained at a net to gross ratio of 0.8 for a
12minimum of 36 consecutive months. After 36 months, the
13commission may evaluate the energy efficiency program and adjust
14the net to gross ratio on a prospective basis.

15(d) The commission shall update cost-effectiveness tools to
16account for long-term benefits and costs that accrue as a result of
17the establishment of programs pursuant to subdivision (a).

end delete


O

    93